BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Renovation of a water / sewer project in Reno, Nevada. Completed plans call for the renovation of a water / sewer project.

Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to upgrade existing dead break elbows to load break elbows in existing 25 KV vaults, upgrade existing transformer bushing wells, and install a new transformer at the decant pump station at the Chalk Bluff Water Treatment Plant. Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project. The Engineer's estimate is: $225,000 - $275,000 This Project is deemed a Horizontal Construction Project. Question Cuttoff Date & Time 7/3/2025 at 2:00 PM PT Questions regarding this solicitation must be submitted through electronically. Answers Due Date 7/7/2025 at 2:00 PM PT All questions submitted prior to the Question cut-off will be answered no later than two (2) business days before the Bid Opening. The Bid Tab and Recommendation for Award will be posted online as soon as is practicable and available to the public for viewing. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work described in these documents shall be conducted under a single prime contract. The following is a general description ofthe Work included. B. The project makes several improvements to the Chalk BluffElectrical System. The project highlights include but are not limited to the following items: 1. Upgrade Splice Vault Terminations: a. Remove and discard existing separable dead break 25kv connectors and dead break cable terminations on each cable within the existing underground splice vaults. b. Install 200A, 25KV, 3-way, load break junction bar. c. Terminate cables with new 200A, 25KV, load break elbows. 2. Upgrade Transformer Bushing Wells, Cable Elbows, and fault indicators a. Replace existing dead break bushing wells within oil filled transformer with new load break bushing wells. b. Replace existing dead break cable elbows with load break cable elbows. c. Perform work necessary to replace bushing wells. Draining and replacing oil if necessary shall be performed in accordance with the transformer manufacturer's recommendations/procedures. 3. Replace Transformer T-l 1-4-1 a. Replace existing 25KV, Oil filled, 250KVA pad mounted transformer with new 500 KVA transformer.

Award

Water / Sewer

$381,206.00

Public - County

Renovation

11

11

5

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
52
Bidding Soon
422
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.