BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and paving for a bridge / tunnel in Visalia, California. Completed plans call for site work for a bridge / tunnel.

The work to be done consists, in general, of replacing the existing bridge with a clear span cast-in-place post tensioned reinforced concrete slab superstructure founded on piles, approximately 35.5 feet in width (measured along the creek alignment) by 75.5 feet in length (measured along the traveled way). Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. Bidders may visit the project site. This project is off of the Federal Highway System. The Project is to be completed within ninety-nine (99) working days from the date to be established in the NOTICE TO PROCEED. The Contract includes provisions for Liquidated Damages if the Project is not timely completed. The County establishes a DBE Contract goal of 21%. At the time the contract is awarded, you must possess a current valid California Class A Contractor's license. The bidder awarded the contract may need to obtain permits, licenses, or enter into other agreements to prosecute the work. Bidders are advised that, unless otherwise stated, the contract price will be full compensation for all required work and no additional compensation will be allowed. If the bidder must obtain permits, licenses, contracts or other services to prosecute the work, the bidder will pay the cost of those items, and no other compensation will be paid by the County. Bids are required for the entire work described herein. Submit the bidder's security in the form of cash, a bidder's bond, or a certified check or cashier's check, in the amount of ten percent (10%) of the amount bid or the bid will be considered nonresponsive. The successful bidder must provide the performance bond, payment bond, workers compensation certificate, and liability insurance policy required by the Special Provisions and contract. four million dollars ($4,000,000) liability coverage is required for this project. Question Deadline 06/25/2025 at 5:30 PM PT Technical questions should be directed in writing to Carlos Gonzalez at the Resource Management Agency, 5961 S. Mooney Blvd, Visalia CA 93277, or via email at RMABids@tularecounty.ca.gov. The Board of Supervisors reserves the right to reject any or all bids, and/or waive any informality in any bid, and/or determine in its discretion the responsibility of any bidder. The Board of Supervisors further reserves the right to use County Forces, or to negotiate contracts, or both, to the extent authorized by the Public Contract Code. Doc Notes: Prospective bid holders must be listed on the planholders list to receive electronic copies of Plans, Specifications, and Bid forms (official bid documents). To be added to the planholders list, contact the Resource Management Agency at (559) 624-7000 or through email at RMABids@tularecounty.ca.gov; Office Hours 9:00 AM - 4:30 PM Mon.-Fri. Bid date notes : Bids may be submitted via mail, but it is the bidder's responsibility to ensure bids are received by the Clerk of the Board prior to the time listed above. Bids may also be dropped off at the above listed address.

Award

Bridges / Tunnels

$2,690,815.00

Public - City

Paving, Site Work

29

18

6

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
41
Bidding Soon
694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 1, 2025

Project location map

Avenue 428, Visalia, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.