Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated July 19, 2025
Site work and outdoor lighting for a mixed-use development in Perry, Florida. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
The project consists of providing all planning, design, permitting, labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work described in the performance criteria package, but not necessarily limited to the following: Design, permitting, and construction of a new softball field, to include but not limited to fencing, netting, bleachers, shade structures, sidewalks, high mast lights, irrigation, grading, dug outs, and other incidentals needed to provide a complete softball field. Bid security in the amount of at least five percent (5%) of the total quote must be submitted with the quote. The contract time for substantial completion shall be 180 calendar days from the date of the "Notice to Proceed (NTP). The final project completion shall be 210 calendar days from the date of the "Notice to Proceed (NTP)". Additional days will be awarded if additional alternates are awarded. The quote security may be either a certified check or a proposal guaranty bond executed by a surety company authorized to do business in the State of Florida. Quote security shall be made payable to Taylor County. The successful contractor must be able to furnish proof of required insurance, a 100% Performance Bond, and a 100% Labor and Materials Payment Bond, and shall begin execution of this contract within five (5) calendar days following the date of the Notice to Proceed. A portion of the funding for this project is being provided by the State of Florida Department of Environmental Protection and will be subject to all applicable grant assurances. The successful contractor will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 21, 1968 and published in the Federal Register (41CFR Part 60-1, 33 F.2 7804). Wages paid to employees must comply with the minimum established by the U.S. Department of Labor Wage Determination. The successful contractor must comply with the Davis-Bacon Act, Copeland Act (Anti-Kickback Act), the Occupational Safety and Health Act, the Contract Work Hours and Safety Standards Act (CWHSSA), Title VI of the Civil Rights Act of 1964 and Executive Order 11246. The Taylor County Board of County Commissioners reserves the right, it its sole and absolute discretion, to reject, to cancel, or withdraw this bid at any time and waive any irregularities in the bid process. The County reserves the right to award any contract to the respondent which it deems to offer the best overall service; therefore, the County is not bound to award any contract based on the lowest quoted price. The County, in its sole and absolute discretion, also reserves the right to waive any minor defects in the process and to accept the bid deemed to be in the County's best interest.
Post-Bid
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - County
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 18, 2025
November 24, 2025
1685 US-19, Perry, FL
Related To This Project
Perry, FL
Bid Date: Jul 03 2025
Perry, FL
Bid Date: Dec 12 2025
Perry, FL
Bid Date: Aug 27 2025
Perry, FL
Bid Date: Oct 03 2025
Perry, FL
Bid Date: Aug 29 2025
Perry, FL
Bid Date: Sep 22 2025
Perry, FL
Bid Date: Dec 12 2025
Perry, FL
Bid Date: Jul 18 2025
Perry, FL
Bid Date: Jul 03 2025
Perry, FL
Bid Date: May 16 2025
Perry, FL
Bid Date: Apr 25 2025
Perry, FL
Bid Date: Apr 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
