Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 29, 2025 at 8:00 PM
Updated October 30, 2025
Renovation of a transportation facility in Perry, Florida. Completed plans call for the renovation of a transportation facility.
As of October 29, 2025 Project has been awarded to Rogers Roofing awarded amount is not available. Project Scope Remove 1 existing shingle roof system down to the wood deck. Replace all rotten decking which includes replacing up to 100 feet of 3 sheathing of plywood. Re-apply nails on existing deck to code - 8d nail every 6 inches. Apply 1 layer of peel and stick, direct to deck underlayment. Install roof vents and new lead stack flashings over plumbing stacks Install galvanized eave drip metal to all eave lines and rakes. Install 16-inch galvanized metal to all valleys. Install new ASTM D7158 Class H shingles (or approved equal) with galvanized fasteners. Includes roof coping cap similar to existing coping -- TBD (stucco, clay, metal). Clean-up and remove all job-related material upon completion. Include all permitting needed to achieve final inspection approval. The contract time shall be 45 calendar days from the date of contract execution. The contractor will be required to return the executed contract to Amy Lovett, City of Perry Purchasing Officer and John Hart, City Manager, within 14 days of council approval. Time can be extended by mutual agreement of both parties. Contractor shall provide a construction schedule with the bid package detailing time frames/lines showing how the project will be constructed. The schedule will be taken into consideration in the bid review process and submitted bids without the schedule could be reason for a bid to not receive full consideration. All inquiries regarding this bid will be directed to Amy Lovett at 850-584-2189. In-person walkthroughs of location are optional and can be conducted during business hours. Call to schedule time. The chosen entity at the time of contract award will be required to sign a Non-Collusion Affidavit, proof of compliance FS287.017, a Drug Free Workplace plan, and an E Verify Affidavit. Event Bid Description: Any bids received without proper external labeling will be rejected. The City Reserves the Right to Reject Any and All Bids. The City Reserves the Right; to Select the Bidder Waiver, Any Informalities, or to Accept the Bid Deemed to Be in the Best Interest of the City. Any Errors in Bid Submissions Are the Responsibility of the Bidder; the City is Not Required to Find Any Errors in Bid Submissions. Bidders Must Also Make Sure Their Summary Page is Filled Out and Submitted With Bid or Bid Will Be Void. The City reserves the right to alter scheduled dates and times.
Award
Transportation Terminals
$800,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 22, 2025
302 S Jefferson St, Perry, FL
Related To This Project
Perry, FL
Bid Date: Dec 12 2025
Perry, FL
Bid Date: Dec 09 2025
Perry, FL
Bid Date: Jan 02 2026
Perry, FL
Bid Date: Jan 02 2026
Perry, FL
Bid Date: Jan 19 2026
Perry, FL
Bid Date: Aug 29 2025
Perry, FL
Bid Date: Oct 03 2025
Perry, FL
Bid Date: Aug 27 2025
Perry, FL
Bid Date: Dec 12 2025
Perry, FL
Bid Date: Jul 03 2025
Perry, FL
Bid Date: Jul 18 2025
Perry, FL
Bid Date: Jul 18 2025
Perry, FL
Bid Date: Jul 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
