BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Demolition and site work for a municipal facility in Cherryvale, Kansas. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The City of Cherryvale is accepting bids for the demolition of structure(s) located at the following addresses: 722 E. 3rd St. 135 W. Whelan St. 210 E. Main St. We, the undersigned company, do hereby submit the following bid for the demolition and removal of all structures in accordance with the attached Contract Documents. By submission of this bid, the bidder agrees that he has personally inspected all demolition sites, has personally read all Contract Documents and is aware of all requirements as contained in these Contract Documents. Bids are to be submitted with a price for the demolition of each structure and for all locations combined. The City reserves the right to accept the bid based upon the lowest total bid per structure or for all structures combined. The City reserves the right to accept or reject any or all bids or to waive any irregularities should they occur as may best benefit the City. Bids shall be guaranteed for a period of sixty (60) days from the date set for receipt of bids. The bid as received includes the value of any salvable material in the structure to be demolished. Demolition work shall be completed within thirty (30) working days from the date of the Notice To Proceed. Bidder agrees to do the following work: 1. 2. 3. 4. 5. 6. Demolish all structures listed below. Clear the lot of all trees, shrubs, fencing material. Unless a tree is marked with a ribbon it shall be removed from the lot. Comply with all requirements for asbestos removal and disposal. Haul the demolition material to a KDH&E approved landfill site and abide by all Federal and State Asbestos Regulations. Sewer lines shall be capped or plugged in a watertight method and inspected by the City. All addresses shall be seeded with grass prior to the completion of the job Demolition shall be the removal and disposal of the entire building, any outbuildings, concrete footers, slabs or any other associated structures at such locations as designated by the City. This shall also include all trees and any brush, vines or bushes, etc. necessary to clear lot. NOTE: The contractor shall be responsible, at his own expense, for removing and disposing in the Montgomery County Landfill or other KDH&E approved landfill site, any and all materials. This shall include but not be limited to paint cans, carpet, furniture, appliances, and other household trash as designated by the City. 2. Transite siding will be removed by hand, wetted and bagged (6 ml), and disposed of in an approved landfill in accordance with KDHE regulations. The contractor will not pulverize or otherwise crush asbestos siding and must remove by hand. 3. If required by the City prior to commencing work, the Contractor shall submit to the City a proposed method of operations for the removal and disposal of the structure(s). The schedule of coordination for shut-off, capping or discontinuation of utility services shall be submitted if so required by the City. Utilities may be left intact only by written request to the City by the owner of record prior to commencing work on the project. 4. 5. 6. 7. 8. 9. Structures to be demolished shall be vacated and discontinued from use or inhabitation prior to commencing work. The Contractor shall cease work immediately and report the same to the City upon discovering either persons occupying the structure(s) for any reason or any other extenuating circumstances that would require action by the City or the owner before continuing demolition operations. The City of Cherryvale assumes no responsibility for the actual condition of the structures to be demolished. The Contractor shall satisfy himself through his own personal investigation of the structural conditions of the building. The Contractor shall not be permitted to use any form of explosive devices or dispose of the materials by burning in the demolition of the structure(s) either at the site or any landfill. The Contractor shall conduct the demolition and removal operations to ensure minimum interference with roads, streets, walks or other adjacent structures or facilities. Any damages caused by the demolition operations to adjacent structures, roads, streets, walks, personal property, etc. shall be repaired or otherwise compensated for by the Contractor at no expense to the City or additional change orders to the contract. No street, sidewalk or other facilities shall be closed or otherwise obstructed for any length of time without written permission from the City prior to the Contractor commencing work. All authorities having jurisdiction over the affected facilities shall be notified by the Contractor no less than twenty-four (24) hours prior to commencing work. If it is necessary to close or otherwise obstruct a street or walkway, the Contractor shall provide at his own expense an alternate route which shall be marked and guarded to ensure the safety of the public. The plans for such alternate routes shall be approved by the City in writing prior to commencing work. Any barricades necessary for the protection of the public during the completion of the demolition operations shall be furnished and maintained by the Contractor. If said barricades are required to be in place overnight, adequate flashing warning lights shall be placed on the barricades to ensure nighttime visibility. 10. The Contractor shall provide safe passage to the public around the demolition area. Demolition operations shall be conducted to prevent damage to adjacent structures, facilities or operations and shall ensure the safety of the public from the demolition operations. 11. The City shall reserve the right to immediately suspend demolition operations upon finding a condition or situation which the City feels is unsafe for any reason. Work shall not continue until said situation or condition has been corrected in a manner acceptable to the City. 12. The Contractor shall provide at his own expense all interior and exterior shoring and bracing as needed to support, prevent movement, settlement or premature collapse of the structure to be demolished. Said support shall remain in place as long as necessary to provide safe conditions. 13. The Contractor shall promptly repair or cause repairs to be made to adjacent facilities or structures for any damages caused by the demolition operations. Said costs incurred by the repairs shall be made by the Contractor at no cost to the City or owners of the adjacent property. 14. The Contractor shall furnish to the City written approval by the owners of said property that acceptable repairs or settlements have been made before final payment has been made and the Demolition Bond is returned. 15. The Contractor shall use water sprinkling, temporary enclosures or other suitable methods to ensure the lowest practical level of dust and dirt arising and scattering into the air. The Contractor shall comply with all regulations of all governmental agencies having jurisdiction over environmental protection as applies to building demolition operations. 16. White goods - air conditioners, refrigerators, freezers, stoves and ovens, microwave ovens, dishwashers, washers and dryers, water heaters, furnaces, televisions, and computers. Remove all items noted in this category and dispose of per Kansas Department of Health and Environment guidelines. 17. Household hazardous wastes - batteries, cleaning supplies, lawn & garden products, indoor pesticides, thermometers and medicines, automotive products, paints, other household chemicals shall be removed from the structure and disposed of at Montgomery County Household Hazardous Waste Department, County Barn, Cherryvale, Kansas, on a daily basis. 18. Special waste-medical supplies, sharps, ammunition, medical waste, freezers and refrigerators that contain food. A special waste permit will be issued to the City for these items. Disposal shall be at an approved sanitary landfill Putrescible waste and household garbage - Canned goods, all food items and any other fast decomposing material that may be found in the structure to be demolished should be separated and taken to an approved sanitary landfill. 20. The Contractor shall demolish the structure completely, remove and dispose of all materials from the site. Such methods as required to safely complete the work in a workmanlike manner shall be employed within the confines of limitations of all governmental regulations concerning demolition operations. 21. Foundations and basement walls shall be demolished completely and disposed of off-site. Basement floors shall be removed or broken thoroughly to facilitate complete drainage at the Contractors discretion providing the highest point of the floor remaining shall be a minimum of two (2) feet below the lowest point of the surface of the finished grade of the site. 22. All voids and below-grade areas resulting from the demolition operations shall be filled with non- organic materials approved by the City to ensure adequate drainage of the area. 23. Such materials shall consist of but not be limited to dirt with stone or other inorganic contents no more than six (6) inches at its widest dimension and free from debris. Trash, frozen materials, roots or other organic material shall not be permitted. The stone content of any fill material shall not exceed twenty-five (25) percent. 24 Prior to placing any fill material, the Contractor shall remove and dispose of all standing water, frost, frozen material, trash or debris. 25. Fill shall be placed in horizontal layers not to exceed six (6) inches in loose depth. Each layer shall be compacted with the fill material being maintained at an optimal moisture content to ensure a density equal to ninety (90) percent of the original adjacent undisturbed earth. If tests are required by City, the compaction tests shall be performed by a competent certified inspector at the expense of the Contractor. 26. The top one (1) foot of the fill area shall be topsoil only suitable for the growth of vegetation with no stone, sand, gravel or large organic material such as roots, stumps, etc. 27. After completing the fill placement, the Contractor shall grade the surface to meet adjacent contours to ensure proper drainage to the surrounding property or other surface drainage structures. Care shall be taken to prevent excess drainage upon adjacent property beyond that amount normally draining across the property prior to demolition. The contractor shall place grass seed on finished grade. 28. The Contractor shall remove all debris, rubbish or other materials resulting from the demolition operations from the site. 29. Materials suitable for fill as specified in Paragraph 12 from the immediate site may be stored on the site at the Contractor's discretion if there is available space. No burning of any material shall be permitted on site Materials, except as noted in Paragraph 1 above, from the demolition operations shall be transported by the Contractor from the demolition site and disposed of in a KDH&E approved landfill. 31. The Contractor shall be responsible for discontinuing all utilities at the demolition site(s) at his own expense and the work required shall be completed as specified by each utility. 32. Sewer mains shall be capped or plugged with a watertight method which shall be inspected and approved by the City. 33. City water service shall be removed by the City at no expense to the Contractor. Any damage to said water service prior to the disconnection by the City shall be repaired at the expense of the Contractor. 34. Unless otherwise stated in the Contract Documents, the Contractor shall have salvage rights from the date of the Notice to Proceed to any and all materials remaining in the structures to be demolished. 35. In the event that the contract is let to multiple contractors, all contractors shall cooperate in the placing of the demolition material at the landfill site

Award

Municipal

$26,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
73
Bidding Soon
654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

Multiple Locations, Cherryvale, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.