Site work for a water / sewer project in Sherrodsville, Ohio. Completed plans call for site work for a water / sewer project.
**As of August 14, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Replacement and relocation of an existing pump station, including site development fencing, electrical service and force main. Contractor shall demolish existing pump station and restore area after new station is operational. Checks should be made payable to W. E. Quicksall and Associates, Inc. Bidding Documents are not returnable for a refund. Question Deadline 06/18/2025 at 4:00 PM ET The engineer will accept questions by submitting any questions in writing to mail@wequicksall.com or fax (330) 339-2227. Bidders who submit a Bid must be a Plan Holder of record at the Issuing Office. Bids from Bidders who are not on the Plan Holders List may be returned as not being responsive. Attention of bidders is called to all of the requirements contained in the bid packet, particularly to the Federal Labor Standards Provisions and Davis-Bacon wages, various insurance requirements, various equal opportunity provisions, and the requirement for a Bid Guaranty and Contract Bond for 100% of the contract price. Bids shall be subject to the condition that the right is reserved to hold bids for a period not longer than 60 days after date of opening and/or to award at any time during the period. The OWNER reserves the right to reject any and all bids, or to increase, to decrease or omit any item or items and/or to award to the lowest and responsible, responsive bidder. The Owner also reserves the right to waive any informalities or irregularities in the Bid received. The Work will be substantially complete within 270 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 300 days after the date when the Contract Times commence to run. Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $500 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently. Question Deadline 07/22/2025 at 4:00 PM ET The engineer will accept questions for this project by submitting any questions in writing to mail@wequicksall.com. Contact information and submittal procedures for such questions are as follows: A. W.E. Quicksall and Associates, Inc. 554 West High Avenue, PO Box 646 New Philadelphia, Ohio 44663. Fax: (330) 339-2227. Email: mail@wequicksall.com. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$237,222.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
August 29, 2025
Cumberland Rd SW, Sherrodsville, OH
Related To This Project
Sherrodsville, OH
--
Sherrodsville, OH
--
Sherrodsville, OH
Bid Date: Dec 15 2022
Sylvania, OH
Bid Date: Jun 16 2025
Findlay, OH
Bid Date: Jun 24 2025
Toledo, OH
Bid Date: Jun 16 2025
Hamilton, OH
Bid Date: Jun 17 2025
Ravenna, OH
Bid Date: Aug 28 2025
Pepper Pike, OH
Bid Date: Jun 20 2025
Darbydale, OH
Bid Date: Jun 25 2025
New Riegel, OH
Bid Date: Jun 12 2025
S Zanesville, OH
Bid Date: Jun 26 2025
Columbus, OH
Bid Date: Jun 24 2025
Akron, OH
Bid Date: Jul 02 2025
Oak Harbor, OH
Bid Date: Aug 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.