Renovation of a municipal facility in Ottawa, Ontario. Completed plans call for the renovation of a municipal facility.

As of August 26, 2025, the project has been awarded to Futech ottawa but the awarded amount is not available. This project is required in order to continue the safe and reliable operation of the 1.5 m Tri-Sonic wind tunnel facility. The existing motors and controls used for the positioning of the supersonic nozzle (SSN) have deteriorated to the point that they are now at a very high risk of failure. These positioning systems use 24 separately controlled motors (Figures 1-3) to configure the profile of the wind tunnel's flexible supersonic nozzle in order to generate the required Mach number for a blowdown. Several components used in these systems have already failed and have either been disconnected or bypassed. Due to the age of these systems, direct replacement components are no longer available and it is not possible to make repairs to the existing equipment. This has resulted in reduced functionality of the systems and there is a growing risk that more of the components will begin to fail, which will cause the system to be no longer operational. In addition, these legacy motor control systems date from the original wind tunnel installation (c.1960), and therefore do not meet the requirements of the present day Canadian Electrical code. One of the recommendations included in the Electrical Condition Assessment report issued by Jp2g Consultants Inc., in September of 2016, was that these controls should be replaced as soon as possible. The aging cabling infrastructure is also an electrical and safety concern. The 1.5 m wind tunnel facility replaced the cabtyre power feeds that run directly from the motor control centers to the junction boxes with Teck90 cable in 2017, however there still exists cabtyre power feeds that run from the junction boxes to the control cubicles in the field that are in poor condition and require attention. Additional benefits which will be achieved through the implementation of modern controls is the increased efficiency of the wind tunnel and mitigation of any risks of human error which could lead to potentially dangerous tunnel conditions that could cause damage to either the wind tunnel systems or client models. Primary goals of the project: 1. To remove all of the electrical hazards that are present in the current motor control system ensuring that the new installation meets all applicable codes; 2. To improve the operational reliability of the system; 3. To ensure that the systems specified are compatible with the future plans of the facility and are capable of providing closed-loop, automated control of the supersonic nozzle setting. Documents can be obtained at: https://canadabuys.canada.ca/en/tender-opportunities Question Deadline 06/27/2025

Award

Municipal

$200,000.00

Public - Federal

Renovation

4

19

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
82
Bidding Soon
1,291
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

August 25, 2025

Project location map

655 Levy Private, Ottawa, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.