Site work and renovation of a municipal facility in Pine Ridge, South Dakota. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

A general overview of the scope of work is as follows: Base Bid - General, Civil, Structural, and Electric for the new Generator Installation Design: Work generally consists of picking up, delivering on-site, constructing, and installing one (1) owner supplied 300-kilowatt generator, three (3) owner supplied 60 kilowatt generators, and three (3) owner supplied transfer switches. This includes the installation of the foundation system; associated equipment including automatic transfer switches, trenching for underground electrical cable installation, other miscellaneous electrical improvements and all site work including grading. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. The purpose of furnishing all materials, labor, equipment, and skill requed for the construction of the new generators, and incidental items, for said owner, as is more fully described and set forth in the Plans and Specifications which are on file at the office of the Engineer. All bidding document interpretations and clarifications should be directed to Jacob Wahle of AE2S at 605-275-5620 (office). Bids shall be submitted on the Bid Forms provided and in accordance with the Bidding Documents. No bids will be considered unless sealed and filed at the Owner, OST DWM&C. Bid security in the amount of 10% of the amount of the bid in the form of a Bid Bond or in the amount of 5% of the amount of the bid in the form of a cashier's check must accompany each bid in accordance with the Instruction to Bidders. Bid security of the three lowest Bidders will be retained until the contract has been awarded and executed, but not longer than sixty (60) days from the date of the bid opening. The successful Bidder is responsible for payment of all required Tribal and State of South Dakota fees, sales tax, and usage tax as described in the contract documents.The successful Bidder is required to meet all requirements of the Bureau of Reclamation Supplemental Provisions as described in the contact documents. Included in the BoR Supplemental Provisions are the requirements; of Executive Order 11375 regarding equal opportunity employment, requirements of the Davis-Bacon wage act, the buy American provisions of Section 501 of the Energy and Water Development Appropriations Act, and other requirements fully described in the contract documents. The Owner reserves the right to reject any and all bids and to waive any irregularities or informalities therein and to award the Contract in the best interests of the Owner. No Bidder may withdraw their bid for a period of 60 days after the bid opening. Doc Note : You may download the digital plan documents by inputting on the website's Project Search page. For assistance in free membership registration, downloading, and working with this digital project information. Copies of the Plans and Specifications and other Bidding and Contract Documents may be obtained . A $50.00 non-refundable fee is required for plans and specifications for requests outside the State of South Dakota. Payment for Bidding Documents is NON-REFUNDABLE. All Work shall be done according to the Bidding Documents. Bid Date Description : Bids being mailed or delivered prior can be sent to: OST DWM&C Attn: Chuck Jacobs PO Box 386 17659 US Highway 18 Pine Ridge, SD 57770 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered

Post-Bid

Municipal

$300,000.00

Public - Federal

Renovation, Site Work

28

18

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Soil Stripping and Stockpiling, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
75
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

img_map_placeholder

Multiple Locations, Pine Ridge, SD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.