BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Site work for a civil project in Springfield, Kentucky. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

City of Springfield (Owner) is requesting Bids for the construction of the following Project: HIGH STREET CULVERT REPLACEMENT The Project includes the following Work: Replacement of existing, and installation of new, stormwater piping and structures. Bids are requested for the following Contract: Contract 770-24-02, High Street Culvert Replacement, Cityof Springfield, Springfield, Kentucky. Prospective Bidders may obtain copies of the Bidding Documents from the Issuing Office as described. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, printed Bidding Documents or electronic documents will be sent via the prospective Bidder's delivery service. The shipping charge amount will depend on the shipping method chosen. Bidding Documents are available for purchase in the following formats: Bidding Documents (including Full-Size Drawings) $250.00 Electronic obtain of Bidding Documents $250.00 For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refertotheInstructions to Bidders that are included in the Bidding Documents. SCOPE OF WORK COVERED BY THE CONTRACT A. These Specifications and the accompanying Drawings describe the work to be done and materials to be furnished for the construction of Contract 770-24-02, High Street Culvert Replacement, City of Springfield, Springfield, Kentucky. B. The Work is located at Springfield, Kentucky. C. Major work items in this Contract include: 1. Installation of new storm sewer line. 2. Replacement of existing stormwater structures. 1.02 WORK SEQUENCE A. First priority shall be given to the sites furthest downstream. B. The CONTRACTOR may apply his work forces to all divisions and sections of this Contract in order that all phases of the work may be completed concurrently, provided the aforementioned divisions and sections are given prime consideration. Question Deadline 06/20/2025

Award

Water / Sewer

$499,278.00

Public - City

Site Work

8

15

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
56
Bidding Soon
1,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 8, 2025

Project location map

E High St, Springfield, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.