BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2025 at 8:00 PM

Updated June 26, 2025

Site work for a bridge / tunnel in Arborg, Manitoba. Completed plans call for site work for a bridge / tunnel.

Reference Number 0000295191 Question Acceptance Deadline 2025/06/20 12:00:00 PM CDT The Contract Administrator will not respond to questions/clarifications within the 24-hour period prior to the Tender submission deadline. Any enquiries shall be forwarded to the Contract Administrator with consideration of this timeline. Construction of a new three cell reinforced concrete box culvert, approach roadworks, and drain realignment in Silver Drain on PTH 68 at the intersection of PTH 7, located in section 15-22-02E in the vicinity of Arborg, Municipality of Bifrost - Riverton. Completion Model The Contract Will Be Assessed Liquidated Damages Damages-completion Specified by Completion Date. Accordance Wit Specification for Liquidated Liquidated Damages Sub Completion 1 Sub Completion 1 Shall Consist of the Roadway Widening Including Bank Widening, Granular Base Course, Asphalt Paving, Traffic Control, Culvert Extensions, and All Other Tasks Required to Allow for Traffic to Be Re-routed Through the One Traffic Detour. This Be Completed by No Later Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. October 4. 2025 the Daily Liquidated Damages After This Specified Completion Date Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Calendar Day Until the Work is Completed. Sub Completion 2 Sub Completion 2 Shall Consist of the Construction of the New Three Cell Box Culvert and Drain Excavation. This Work Shall Be Completed by No Later Than March 31, 2026 the Contractor Completed to Accommodate This Date. Necessary Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Remaining Work Shall Be Completed in Accordance With the Drawings and Specification by No Later Than July 5, 2026 the Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2000.001 Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidated Damage Charge at Any Given Time Shall Be Two Thousand ($2.000) Dollars Per Calendar Day Until the Work is Completed Seasonal Shutdown Date The Seasonal Shutdown for in Stream Work is April 1-june 15 of Any Given Year The Season Shitdown for Roadwork is October 15 of Any Given Year. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$3,590,497.00

Public - State/Provincial

Site Work

29

4

12

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
31
Bidding Soon
468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

MB-68, Arborg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.