BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and paving for a civil project in Waterbury Ctr, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Barnes Hill Road (TH# 3) in the Town of Waterbury has experienced an embankment slide due to past flood waters in Thatcher Brook. If this condition continues the embankment slide threatens to undermine an existing Edward Farrar Utility District (EFUD) 12" ductile iron water main, located between the Town Highway and the top of embankment, the existing Town highway and a Green Mountain Power utility pole. The scope and sequence of work includes, but is not necessarily limited to: A. Repair area approximately 150 ft L X 32 ft H. 1. Mobilization/demobilization. 2. Clear and grub small trees/brush as needed along the embankment. 3. Construct a key way (150 ft L X 4 ft D below stream bed X 4 ft W) with heavy type rip rap). No fabric in key way. Quantity rounded to 100 CY 4. Two layers of fabric, 8 oz nonwoven, will be placed behind all stone except in the keyway heavy rip rap type area. 5. From the top of key way stabilize the next 24 ft H with Type 4 stone approximately 150 ft L X 24 ft H x 4 ft. Quantity rounded to 550CY 6. Stabilize remaining slope with Type 2 stone approximately 200 ft L X 8 ft H with taper depth of 4 ft to 2 feet. The 200 ft L allows for additional access. Quantity rounded to 200 CY. 7. Utilize slope revegetation with top soil-150 CY 8. Slope stabilization with seed, fertilizer and erosion matting 9. Mill and repair pavement (assume 30 CY). 10. Provide traffic control. See "C" below for requirements. 11. Miscellaneous work and cleanup. 12. Assume all material excavated shall be wasted off site 13. Temporarily remove and reinstall mail box for #1187 Barnes Hill Road. B. Work shall be accomplished from top of bank with no equipment allowed in the brook. C. During the duration of work, the Contractor shall maintain single lane one way traffic on Barnes Hill Road. On one side, the work site is just beyond a dip and curve in the road so temporary traffic lights (each end) shall be installed for 24 hour operation. D. Contractor shall submit a simple written project schedule to the Town for approval prior to commencement of work. The Town and Contractor shall review this schedule and work tasks at a preconstruction meeting. Extended wet weather, with rise in Thatcher Brook waters, may require temporary postponement of work. E. Staging and material storage areas are very limited in the project area. F. Work in stream and along the embankment is restricted to July 1 to October 1, 2025. A. The project is funded by FEMA B. Bid Bond, Performance Bond and Payment Bond are not required for this project. C. Davis-Bacon Act does not apply to this project.

Under Construction

Roads / Highways

$120,550.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
94
Bidding Soon
1,250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

July 28, 2025

Project location map

W Barnes Hill Rd, Waterbury Ctr, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.