Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work and paving for a bridge / tunnel in Waterbury Ctr, Vermont. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge 14 Loomis Hill Road Bridge is structurally in good shape but existing rip rap that provides erosion protection needs to be reset and additional rip rap added. A short length of the downstream end of Abutment 2 has been undermined. Several large stone sit precariously on the embankment upstream corner of Abutment 1 which help protect the abutment. In front of Abutment 2 some large stones have been moved into the stream bed. Large stone have been moved by hydraulic forces to the center of the stream under the bridge. Gravel deposits, especially upstream, need to be removed though not lower than existing stream bed. This will help direct the stream flow more toward the center of the brook. Two large trees have fallen across the brook upstream of the bridge. These trees are considerably outside of the road ROW but if not removed may end up plugging the upstream side of the bridge. Recent heavy rain/stream flow has diverted stream flow around the root ball. Work has been reviewed with regional State of Vermont Stream Alteration engineer and approved. The scope and sequence of work includes, but is not necessarily limited to: A. Reset and add large stone riprap under both sides of the bridge including relocate/reset large stones that has been moved to the center of the stream under the bridge. B. Include smaller chinker stone to help inhibit stream flow behind the stone. C. Retrieve large armor stones that were washed downstream and reset. D. Add additional large stone rip rap, on both sides, to 30 feet upstream of the bridge to help minimize stream bank wandering. No key way construction. E. Fill void under Abutment 2 with flowable fill concrete. Assume 4CY F. Remove two large gravel deposits upstream of the bridge to help direct stream flow to the center of the stream. Assume 50 CY. Town will allow gravel to be stockpiled behind ice center for Town future use. G. Remove two large trees upstream of the bridge. Tree trunks to be rolled over on adjacent land. Roll large root ball against bank. Trees 36" diameter +/- x 40 feet. H. Utilizing Type 4 stone, armor stream bed starting 15 ft upstream/under Bridge 14/to 20 ft downstream I. During the duration of work, the Contractor shall maintain single lane one way traffic on Loomis Hill Road. On one side, the work site is just beyond a somewhat blind descending curve in the road so temporary traffic lights (each end) shall be installed for 24 hour operation. J. Contractor shall submit a simple written project schedule to the Town for approval prior to commencement of work. The Town and Contractor shall review this schedule and work tasks at a preconstruction meeting. Extended wet weather, with rise in Thatcher Brook waters, may require temporary postponement of work. K. Staging and material storage areas are very limited in the project area. L. Work in stream is restricted to July 1 to October 1, 2025. Project Funding Requirements A. The project is funded by FEMA B. Bid Bond, Performance Bond and Payment Bond are not required for this project. C. Davis-Bacon Act do not apply to this project. Any questions that come up after the site visit shall be submitted in writing to William Woodruff, Town of Waterbury Public Works Director. Written questions can be faxed (802-244-1014), emailed to bwoodruff@waterburyvt.com or delivered in person to the Municipal Complex, 28 North Main Street, Waterbury, VT. No questions will be taken after 5:00 PM on June 26, 2025.
Award
Bridges / Tunnels
$29,350.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
August 1, 2025
Loomis Hill Rd, Waterbury Ctr, VT
Related To This Project
Waterbury Ctr, VT
Bid Date: Jul 01 2025
Hartford, VT
Bid Date: Jun 17 2025
Saint Johnsbury, VT
Bid Date: Jun 27 2025
Springfield, VT
Bid Date: Jun 09 2025
Woodford, VT
Bid Date: Jun 09 2025
Brattleboro, VT
Bid Date: Jan 07 2026
Barnard, VT
--
Pittsford, VT
Bid Date: Jun 24 2025
Sharon, VT
Bid Date: Jun 06 2025
Hartford, VT
Bid Date: Jul 10 2025
Middlebury, VT
Bid Date: Mar 26 2021
Burlington, VT
Bid Date: Jun 04 2025
Chester, VT
Bid Date: Jul 07 2025
Rutland, VT
Bid Date: Jul 02 2025
Dummerston, VT
Bid Date: Jun 13 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.