Renovation of a power facility in Fulton, New York. Completed plans call for the renovation of a power facility.

Reference Number 0000389627 ERF Dump Floor and Loader Chase Concrete Repairs Oswego County's Energy Recovery Facility is soliciting bids from qualified contractors to furnish all labor and equipment as it pertains to replacement of the concrete dump floor, and repair of the concrete loader chase wall. Question Acceptance Deadline 06/13/2025 03:00 PM EDT Questions are submitted online No We will only answer questions that are emailed to purchasing@oswegocountv.com. Oswego County requires the successful contracting firm to furnish all labor and equipment as it pertains to the partial removal and replacement of the existing concrete dump floor, and repair of the existing Loader Chase wall at the Oswego County Energy Recovery Facility (ERF) located at 2801 State Route 481, Fulton, NY 13069. Work will be performed during a scheduled facility shutdown. In addition, the scope of this project will include, but is not limited to the following. o Removal of existing 18"x18"x18" sand trap/floor drain located at the dump floor level, and a 8" diameter PVC drain pipe running between the sand trap/floor drain and the loader chase wall. o Replacement of the existing 18"x18"x18" sand trap/floor drain, and 8" diameter PVC drain pipe with a Contractor provided and installed 1,500-gallon precast concrete holding tank, inlet grates/frames, and 8" diameter schedule 80 PVC drain pipe running between the holding tank and the loader chase wall. o Partial removal and replacement of existing concrete push walls along west edge of Dump Floor at the separation between dump floor level and the lower ash floor level. o Surface preparation and painting of steel floor framing supporting the replaced elevated Dump Floor located over the Loader Chase. 2.1.2 The Contractor is expected to begin work August 4, 2025 and be substantially completed in accordance with the Contract Documents by October 3, 2025.

Post-Bid

Power Plant

$30,000.00

Public - County

Renovation

13

8

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
148
Bidding Soon
1,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

August 4, 2025

Project location map

2801 NY-481, Fulton, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.