BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a road / highway in Villa Rica, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 15, 2025, this project has not yet been awarded. The project is expected to be awarded on September 9, 2025 The City of Villa Rica has issued an invitation to submit a bid for Mirror Lake Blvd Improvements as indicated herein. Construction includes the widening of Mirror Lake Blvd for the installation. - Construction includes the installation of a Left Turn Lane on Mirror Lake Blvd - The Contractor shall provide a graphic construction schedule (bar chart) indicating various subdivisions of the work with a reasonable breakdown for each task to include the days in duration and the dates of commencing and finishing each task. Question Deadline 07/21/2025 Any questions and/or misunderstandings that may arise from this invitation shall be submitted in writing at least 10 days prior to the bid opening. Send to Mark Teal, PE at TealE2.Consulting@gmail.com. The City will not respond to any questions received within 10 days prior to the bid opening. Answers to questions submitted that materially change the conditions and specifications of this invitation for bid will be promulgated to all email addresses as an addendum. Any discussions or documents will be considered non-binding unless incorporated and promulgated in an addendum. City of Villa Rica provides equal opportunities for all businesses and does not discriminate against any person or business because of race, color, religion, sex, national origin, handicap or veterans status. This policy ensures all segments of the business community have access to supplying the goods and services needed by the City of Villa Rica. The City of Villa Rica reserves the right to waive any and all technicalities and informalities, reject any or all bids, and make the award in the best interest of the City. It is intended that the Instructions to Bidders, General Conditions, and Detailed Specifications shall define and describe the complete work to which they relate. Each Proposal must be accompanied by a bid bond for an amount equal to at least five percent (5%) of the bid amount. If for any reason whatsoever the Bidder withdraws from the competition after opening the bids, or if he refuses to execute the Contract, the Owner will proceed on the Bid Bond. The Surety of the Bid Bond (5%), Performance Bond (100%), and Payment Bond (100%) shall be a surety company authorized to do business in the State of Georgia, shall be listed in the Department of the Treasury Circular 570, and shall have an underwriting limitation in excess of 100% of the bid amount. The Bonds and Surety shall be subject to approval by the Attorney for the Owner. Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. Contract Time: Contract time shall consist of 180 calendar days for the completion of work, to be computed from the date of the Notice to Proceed. Liquidated damages shall be assessed at $300 per day. Communications concerning this Bid shall be addressed to: Teal Education & Engineering Consulting, LLC Cell: 770-378-2408 Email: TealE2.Consulting@gmail.com, Attn: Mark Teal, P.E.

Award

Roads / Highways

$447,361.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
184
Bidding Soon
2,154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

Mirror Lake Blvd, Villa Rica, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.