Site work for a power facility in Fairmont, Minnesota. Working plans call for site work for a power facility.

**As of July 17th, 2025, the owner has selected a Design Builder. A timeline for construction has not yet been established.” The general nature of the work on which bids will be received consists of helical pile foundation design and installation, including helical pile concrete caps for the FES Substation. The Contractor will be responsible for supplying all labor, materials and equipment for the foundations, along with miscellaneous associated work. Est. Completion Date:Oct. 24, 2025. Question Deadline 06/25/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Pre-Construction/Negotiated

Power Plant

$581,086.00

Public - City

Site Work

9

12

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
39
Bidding Soon
412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

November 3, 2025

Project location map

Multiple Locations, Fairmont, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.