BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Renovation of a transportation facility in Roseville, California. Completed plans call for the renovation of a transportation facility.

Base Bid Scope of Work Contractor to provide all wiring, bolting, hardware, and equipment for the installations listed below. The Level 3 charging equipment requires fiberoptic connections between the units being installed. Contractor to include fiber-optic connectivity as part of their scope. All commissioning coordination to be included as part of the contractor's work. Product to be tested, calibrated, and delivered in fully functional state to the City upon completion. The City (or City consultant, Construction Manager) will submit for permitting. Contractor must maintain a faithful construction bond. The project may need to be completed in up to 3 mobilizations. 1. Install 6 PCS charging units (ABB 6AGC081325) 6 PCS units have been purchased by City Per ZEBD Phase 2 plans: Install PCS # 4,5,8,9,10,11 2. Install 21 EVD dispensing units (ABB 6AGC08140) associated with the 6 PCS units 18 EVD units have been purchased by City 3 EVD units to be purchased by contractor to match existing equipment. 3. [REVISED] Purchase and Install 16 Level 2 chargers (Updated 5/27/25 to FordFPC-AC0048ZC-U) and associated equipment. 16 Level 2 chargers 8 pedestal mounts with dual retraction (Ford Pedestals FPC-PO0096DZ-UAA - dual sided) 2 pedestal power distribution panels 2 transformers Power, data conduits, and wiring per ZEBD Phase 2 plans. Associated trenching, concrete, and asphalt works. 4. Install 58 protective bollards (4" Concrete Filled) Area where bollards to be installed is paved and has substantial electrical infrastructure under the pavement. Bollards will require shallow footings in some areas and must be vacuum excavated. After installation of the footings, the areas will need to be restored with AC pavement. Contractor to match existing 4" diameter 48" tall bollards, painted yellow, with reflective banding. Contractor to provide all materials. Add-Alternate Scope of Work As an optional add-alternate service: 5. Install 17 wheel stops in existing parking area part of the ZEBD fleet parking area. Contractor to provide (17) wheel stops matching existing parking at north row of fleet parking area. 6. Purchase and install 2 PCS charging units (ABB 6AGC081325) 2 PCS units to be purchased by Contractor Per ZEBD Phase 2 plans: Install PCS # 6,7 7. Purchase and install 4 EVD dispensing units (ABB 6AGC08140) 4 EVD units to be purchased by Contractor Question Deadline Jun 16, 2025 at 5:00 PM Direct all inquiries regarding this RFP in writing to Rebecca McCoy from Public Works Facilities by accessing the RFP from the City website Addendum 1- June 13th, 2025: RFP Answers to Questions As a basis of design, the Jensen Precast Model S-48 should be used. An approved equal will be accepted. 5 year warranty is adequate. QA - 6/16/25

Award

Transportation Terminals

$1,870,000.00

Public - City

Renovation

18

16

24

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
213
Bidding Soon
2,143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

August 19, 2025

Project location map

Multiple Locations, Roseville, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.