BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

This is a service / maintenance or supply contract in Winston Salem, North Carolina. Contact the soliciting agency for additional information.

Winston Salem/Forsyth County Utilities (WSFCU) is seeking qualified engineering firms to update its Wastewater Facilities Master Plan. The department currently operates and maintains two wastewater treatment plants -- Archie Elledge WWTP (30 MGD) and Muddy Creek WWTP (21 MGD) -- as well as a Biosolids Drying Facility and multiple sewer lift stations. The existing master plan, last revised in April 2018, requires a comprehensive update to support long-term capital improvement planning over a 20-year horizon. The purpose of the master plan is to provide long term guidance and planning for future capital improvement projects at both wastewater treatment facilities and the Regional Biosolids Drying Facility over a 20 year planning period. The updated plan should identify and prioritize infrastructure upgrades necessary to meet future regulatory requirements, enhance system reliability, and accommodate projected growth, including annexation and increased industrial demand. Key components of the plan must include residuals projections; development of treatment process models for both treatment facilities; infrastructure planning aligned with forthcoming nutrient regulations; and detailed cost estimates for all proposed improvements. WSFC Utilities desiresto transition to an integrated, non-proprietary master planning framework designed to support seamless access and collaboration among capital project engineers, division managers, and Utilities Administration staff. The selected firm will be responsible for incorporating the recently completed Collection System Master Plan into a unified Capital Improvement Program (CIP) that future master plans can be incorporated into as they are completed. This consolidated CIP framework must organize projects by implementation year and priority and include detailed cost estimatesto support annual capital budgeting and accurate spend planning. Additionally, WSFC Utilities intends for this planning tool to function as a dynamic, updateable interface that can adapt to evolving infrastructure needs and organizational priorities. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
140
Bidding Soon
1,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2025

Project location map

Multiple Locations, Winston Salem, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.