BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and paving for a civil project in Fort Mill, South Carolina. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

This project is the widening of US 21 Bypass and SC 51. The work generally consists of select clearing and grubbing, widening of US 21 and SC 51, extensions of two 5x5 concrete box culverts, one 6x6 concrete box culvert and associated storm drainage pipes, boxes and inlets, the realignment of Gold Hill Rd., US 21 Business, Spring Hill Farm Rd., Old Nation Rd., etc. PROJECT DESCRIPTION 1.1. The Work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services and incidentals; and of performing all work necessary to complete all specified work in accordance with the Contract Documents prepared therefore and entitled Widening of US 21 Bypass and SC 51. The work generally consists of select clearing and grubbing, widening of US 21 and SC 51, extensions of two 5x5 concrete box culverts, one 6x6 concrete box culvert and associated storm drainage pipes, boxes and inlets, the realignment of Gold Hill Rd., US 21 Business, Spring Hill Farm Rd., Old Nation Rd., etc; and performing all work necessary to complete all specified work in accordance with the Contract Documents prepared therefore and entitled Widening of US 21 Bypass and SC 51. 1.2. Completion time for the project will be 1095 calendar days as set forth in the Agreement. The contractor will start the work covered by The Department of the Army Regional General Permit SAC# 2015-00812 as soon as possible from the Notice to Proceed. 1.3. The Gold Hill realignment with US 21 has an interim completion date of June 30, 2026. There is an elementary school on Gold Hill Road opening for the 2026/2027 school year and the realignment must be complete before the school opens.

Bid Results

Roads / Highways

$62,511,925.00

Public - County

Paving, Site Work

907

22

24

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
168
Bidding Soon
1,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

August 22, 2025

Project location map

US-21 & SC-51, Fort Mill, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.