Site work for a water / sewer project in Benton, Kentucky. Working plans call for site work for a water / sewer project.

PLEASE NOTE: As of June 30, 25, the bid date has been extended to July 16, 2025. The Marshall County Conservation District is requesting proposals for the following project: Provide engineering design services for the earthen auxiliary spillway repair of East Fork Clark's River Flood Retarding Structure #28A (Willie Holmes Lake) in Marshall County, Kentucky. Professional services to include but not limited to site surveys, geotechnical investigation, laboratory testing, and deliverables (drawings, specifications, cost estimate, construction schedule, quality assurance plan, and as-built drawings). The scope of professional services may also include assistance with and/or preparation of construction bid documents. Proposals will be evaluated by the selection committee based on the following criteria: 1. Relative experience of consultant personnel assigned to the project team with major dam projects for NRCS and/or state, local or other federal government agencies. (35 points) 2. Past record of performance on projects similar in type and complexity. (35 points) 3. Project approach and proposed procedures to accomplish the services for the project. (15 points) 4. Available team workload capacity to comply with project schedule. (10 points) 5. Knowledge of the locality and familiarity of the general geo- graphic area. (5 points) The method of Contractor Selection has not been Determined at this time. SUMMARY A dam breach analysis was developed using HEC-RAS 2D Version 6.3.1 with the best available 5-foot or less topographic data. The breach analysis was conducted in accordance with the National Watershed Program Manual (2014) and NRCS Breach Analyses requirements. Unsteady State HEC-RAS 2D models were developed with breach hydrographs calculated using the TR-60/TR-66 method with the best available dam as-built data for each site. The hydrographs were applied to 2D HEC-RAS models in unsteady state conditions. This breach analysis study is not intended to determine hazard potential classification at this time since the current scope of work excluded field survey of structures, roads, bridges, railroads, and culverts. SITE DESCRIPTION East Fork Clarks River FRS 28A (KY00199), located in Marshall County. Kentucky had a "Low" hazard potential classification at construction, and the current hazard potential classification is "Significant" per the National Inventory of Dams (NID). The primary purpose of this Dam is Flood Risk Reduction. The downstream valley below East Fork Clarks River FRS 28A is characterized as very low sloping (0.196%) with areas of farmland, and few houses. Breach flows to Middle Fork Creek, crosses Oak Level Rd, Breezeel School Rd and Symsonia Hwy and then meet Clarks River about 4.3 miles downstream. The breach mapping distance extends approximately 7 miles below the dam. This evaluation identified 2 structures that are potentially at risk from a catastrophic breach and the breach may overtop the downstream roads Oak Level Rd, Breezeel School Rd and Symsonia Hwy. Shortlist Confirm

Final Planning

Water / Sewer

Public - County

Site Work

26

3

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

July 16, 2026

Project location map

To Be Determined, Benton, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.