BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a water / sewer project in Wolf Point, Montana. Working plans call for the renovation of a water / sewer project.

**As of July 24th, 2025, no bids received. No definite date for the rebid.** The project consists of two schedules. Schedule One includes improvements at the City's Main Lift Station. The improvements at the Main Lift Station include upgrading the existing controls with level transmitters as the primary controls and floats as secondary controls; updating the ventilation system; installing a new backup generator; installing a new control panel; installing two, new electric trolleys and chain hoists; installing a gas monitor; removing and replacing all of the doors; installing a new tin roof; and modifications to the lifting equipment. Schedule Two includes improvements at the Birch Street Lift Station. The improvements at the Birch Street Lift Station include upgrading the existing controls with level transmitters as the primary controls and floats as secondary controls, installing a new electric trolley and chain hoist, installing a new control panel, removing and replacing the doors, installing a new tin roof, installing new motor starters, new alarms, upgrades to the ventilation system, and installing gas monitor. Funding for this project is from the EPA Clean Water Act managed by the Indian Health Service. All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering no later than 5:00 PM local time on Question Deadline; 07/03/2025

Final Planning

Water / Sewer

$1,800,000.00

Public - City

Renovation

5

28

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
5
Bidding Soon
25
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

January 26, 2026

Project location map

Multiple Locations, Wolf Point, MT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.