EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Renovation of a mixed-use development in Binghamton, New York. Completed plans call for the renovation of a educational facility.

This project will proceed under multiple prime contracts, consisting of: Contract 03 - Electrical Work (EC) All Requests for Information (RFI) must be received no later than 12:00 noon on Wednesday, July 16, 2025. Any RFI received after this time will receive no response. The aforementioned prime contracts constitute the entirety of the project and include all Work described in the Contract Documents. The work of this project generally includes, but is not limited to, General Construction, Mechanical, and Electrical to renovate offices The Contractor shall achieve Substantial Completion of the entire Work not later than November 7, 2025. A Bidder, making the deposit required for the Bidding Documents, submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids and if the copy of the plans and specifications used by such Bidder, other than the successful Bidder is returned in good condition within thirty (30) days to Syracuse Blueprint Company (address above) award of the contract covered by such plans and specifications, or rejection of the Bid, the full amount of such deposit for one copy of the plans and specifications shall be returned to such Bidder, including the successful Bidder. A Bid Security in the amount of five percent (5%) of theBid must accompany the bid in accordance with the Instructions to Bidders, A non-collusive bidding certificate shall be included on each bid. An Iran Divestment Act Certification shall be included on each bid. A Sexual Harassment Certification shall be included on each bid. A Labor Law Section 220-i Certification shall be included on each bid. This is a prevailing wage rate job. A Bidder, making the deposit required for the Bidding Documents, submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids and if the copy of the plans and specifications used by such Bidder, other than the successful Bidder is returned in good condition within thirty (30) days to Syracuse Blueprint Company (address above) award of the contract covered by such plans and specifications, or rejection of the Bid, the full amount of such deposit for one copy of the plans and specifications shall be returned to such Bidder, including the successful Bidder. Partial reimbursement, in an amount equal to the full amount of such deposit for one set of plans and specifications per unsuccessful bidder or non-bidder less the actual cost of reproduction of the plans and specifications, shall be made for the return of all other copies of the plans and specifications in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Question Deadline 06/18/2025 at 12:00 PM ET All Inquiries to: Attn: Michael DeCarlo LaBella Associates, P.C. 316 S. Clinton St., 2nd Floor Syracuse, New York 13202 (585) 402-7021 mdecarlo@labellapc.com

Post-Bid

Educational

$225,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Laboratory Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
64
Bidding Soon
977
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

July 25, 2025

img_map_placeholder

435 Glenwood Rd, Binghamton, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.