Site work for a water / sewer project in Howey in the Hills, Florida. Completed plans call for site work for a water / sewer project.

The work will include the installation of a permanent emergency backup pump, concrete slab and an automatic transfer switch. This work will also include replacing the two (2) existing wet well pumps with upgraded pumps. The wet well pumps pumping capacity will be 400 GPM for each pump. The project will consist of hydromantic submersible non-clog sewage pumps (model S4K2500M3-4) with 50’ power cords, 10” impellers, 4” discharge, 3” solids capability, 25 HP, 1750 RPM motors with seal failure and thermal overload sensors. This project will consist of installing (1) Godwin Permanent standby diesel bypass pump with concrete base slab, 4” DI / PVC discharge piping. First Diesel fill up (1) day startup and training XYLEM / GODWIN 347 GPM @ 93’ TDH Dri-Prime CD140M Critically Silenced * Sound Attenuated Enclosure * 4” 150# Flange Suction & Discharge * John Deer 4045H280-T3 Diesel Engine * Includes Prime Guard and Auto Throttle * Skid-mounted, Emergency Standby * Base Options * UL Double Wall Tank * Engine/Motor Options * Electrical – 1750 Watt AC/DC Inverter * Battery Charger – 12 Volt Trickle * Double Gang (2) GFCI Duplex Receptacles Suction piping to be high density polyethylene, cored into the wet well with stainless steel supports. Discharge piping to be ductile iron above grade, PVC below grade, wet tapped into the onsite force main. – Site restoration to include backfilling and compacting only. VENDORS THAT WISH TO SUBMIT A BID ON THE PROJECT CAN SCHEDULE A MEETING AND MEET WITH MORGAN CATES, PUBLIC SERVICES DIRECTOR, PRIOR TO SUBMITTING THE BID. CONTACT MR. CATES AT 352-324-2290 EXT 117. The Town intends for the Project to be completed within a period of six months from the Notice to Proceed. Question Deadline 06/18/2025 The procurement will be in accordance with Section 255.20, Florida Statutes. The project will be awarded to the lowest qualified and responsive bidder that contracts to complete the project within 6 months of the notice to proceed in accordance with the modified AIA A104 construction contract attached to this RFB. The contract will be awarded to a single vendor. In the event the low-bidder fails to execute the contract with the Town, the Town may enter into a contract with the second-lowest qualified and responsive bidder, and so on, until a contract is signed; or alternatively, at any time, the Town may rebid the project.

Award

Water / Sewer

$207,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
148
Bidding Soon
2,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 2, 2025

Project location map

800 S Palm Ave, Howey in the Hills, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.