BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Site work, paving and outdoor lighting for a mixed-use development in Crescent City, California. Completed plans call for site work for a pipeline; for outdoor lighting for a pipeline; for paving for a pipeline; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

This project includes street and utility improvements on Front Street between Play and L Street, and K Street between Front Street and Second Street. This project also includes Beachfront Park Gateway improvements requiring excavation and grading, pathways, landscaping, and cultural and art element installations on the south side of Front Street between Play Street and L Street. The street work includes the furnishing of the labor, materials, and equipment for the installation of a replacement storm drain system, replacement water mains, fire hydrants, valving and services, sewer main installation, gas line relocation, irrigation piping and controls, curbs, gutters, sidewalks, and pedestrian crossings, a reconstructed road section for Front and K Streets, and new street lighting fixtures, all in accordance with the drawings and specifications. The Gateway improvements include demolition, earthwork and grading around the Cultural Center on Front Street, new concrete pathways for building access and a cultural trail, decorative concrete elements and concrete retaining/seat walls, irrigation piping and controls, landscaping, area lighting, installation of kiosks with informational and cultural signage, and the construction of foundations for Gateway signage as well as cultural trail structural elements. Qualifications: Contractor must be licensed as an (A) General Engineering Contractor by the California Contractors State License Board to bid on this project. Bidders must correctly prepare and submit the documents listed in Section 00 40 00, Bid. Each bid must be accompanied by a bid guaranty bond, or a certified or cashier's check payable to the order of the Owner in an amount not less than ten percent (10%) of the amount of the bid as a guaranty that the bidder will execute the contract if it is awarded in conformity with the bid form. The successful bidder will also be required to furnish performance and payment bonds, each in an amount not less than one hundred percent (100%) of the contract price in the form provided herein. This is a Public Works Project subject to the rate of prevailing wages as established by the California Department of Industrial Relations and the U.S. Department of Labor. Bidders are notified that the higher of either the Davis-Bacon or the State prevailing wage rate shall apply. Deadline to submit written questions June 20, 2025 Contract Negotiations July 3, 2025 Contract before City Council July 7, 2025 PN - 2024-1001.1

Award

Roads / Highways

$5,248,336.00

Public - City

Outdoor Lighting, Paving, Site Work

51

5

3

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
5
Bidding Soon
152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

January 19, 2026

Project location map

Multiple Locations, Crescent City, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.