BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Demolition, site work, paving and new construction of a mixed-use development in Pacifica, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; for paving for a educational facility; service station / car wash facility; service station / car wash facility; service station / car wash facility; service station / car wash facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

Project No: 22081-0040 Question Deadline 07/08/2025 at 5:00 PM PT RFI shall be sent via emailed to Lev Weisbach, lweisbach@brookwoodgroup.com and Brett Keeler Brookwood Group Construction Manager, Brett@maverickredevelopment.com The project is located at 930 Oddstad Blvd. in Pacifica California. The site is 16.49 acres. The site is bordered by a residential neighborhood to the north and east and abuts the Frontierland Park to the south and west. The project includes demolition of the existing buildings and construction of new housing. There is an 40,000 SF single-story permanently closed elementary school on the site and 3 portable classroom buildings to be demolished. Hazardous materials abatement at the site has been completed. The new construction includes a total of ten buildings, two bike storage, two trash enclosures, 3 solar carports, and landscape amenities. There are (2) two-story apartment buildings, (5) two-story townhouse buildings, a one-story management office, a one-story commons building, and a one-story public service building with toilets and locker room facilities for the adjacent playfield area of Frontierland Park. The 7 residential buildings contain a mixture of 1,2- and 3-Bedroom units for a total of seventy (70) residential units. There are (31) onebedroom, (29) two-bedrooms, and (10) three-bedroom units. The total floor area is 96,135 sqft. All questions or inquiries should be forwarded to Lev Weisbach - Brookwood Group Development Manager, lweisbach@brookwoodgroup.com phone: 415 297 7165, and Brett Keeler - Brookwood Group Construction Manager, Brett@maverickredevelopment.com phone: 203-273-9086

Bid Results

Educational

$47,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

452

26

416

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
252
Bidding Soon
2,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

September 10, 2025

Project location map

930 Oddstad Blvd, Pacifica, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.