EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a clubhouse / community center in Vancouver, British Columbia. Completed plans call for the renovation of a clubhouse / community center.

The city seeks a contractor to replace the three existing boilers with two new boilers and decouple the Domestic Hot Water (DHW) from the boiler plant. Integrate a new heating solution utilizing a CO2 heat pump and a swing tank at Coal Harbour Community Centre. The Work generally includes, but is not limited to: Replacing the existing boilers with new boilers; and Decouple the Domestic Hot Water from the boiler plant; and Integrate a new heating solution. Question Deadline 07/04/2025 at 3:00 PM PT

Sub-Bidding

Clubhouse / Community Centers

$500,000.00

Public - City

Renovation

15

10

8

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
47
Bidding Soon
1,252
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

September 1, 2025

img_map_placeholder

480 Broughton St, Vancouver, BC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.