BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work and outdoor lighting for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The General Work Requested is: The installation of New Lighing Units Per The Installation and Special Provision Guidelines,Installation of Ot H Er Electrical Appurtenances, and the Removal of Existing Lighting Units and Other Existing Electrical Appurtenances, Etc.; St240240506 - Solar Street Lighting System Installation at Various Southside Locations Time for Completion: All Work On This Contract Shall Be Completed by November 7, 2025. Liquidated Damages, Per Diem: $500.00/day The Sbe Requirement for This Project is 25% of the Contract Base Bid. The Sbe Compliance Plan (Form a) Must Be Submitted With the Bid and is an Element Of Bid Responsiveness. Sbe Certificates Must Be Submitted With the Form a. Incomplete Sbe Compliance Plans (Form a) Or Inaccurate Sbe Compliance Plans Will Not Be Accepted and Will Render the Bid Unresponsive. If There Are Any Questions Regarding Sbe Firms, Please Contact the Oei Office At 414-286-5553. Bid Security Required: Bond, Certified Check, Cashier's Check Or Cash to Accompany Bid: 10% Of the Contractor's Base Bid. For Those Bids Being Submitted Through online and Using a Manual Bond, the Contractor May Send a Signed/executed Copy of the Bid Bond to the Department of Public Works Contract Office by Emailing Dpwbids@milwaukee.gov. The Emailed Copy of the Bond Must Be Received by No Later Than 10:30 a.m. On the Same Date That the Bids Are Due for That Specific Official Notice, or the Bid Will Be Considered Non-responsive. The Original Bid Bond Document Must Then Be Submitted by the Contractor to the Department of Public Works Contract Office in-person or By Mail to 841 N Broadway, Rm. 506, Milwaukee, Wi 53202 For the pole removal, City requests contractor to start the removal in Spring 2026 and complete by May 30, 2026. The solar light system installation is to be complete by Nov 7, 2025. The bidder's commitment for Resident Preference Program Participation on the project is 40%

Award

Roads / Highways

$99,500.00

Public - City

Outdoor Lighting, Site Work

5

4

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
52
Bidding Soon
1,946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2025

July 25, 2025

Project location map

Multiple Locations, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.