Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 21, 2025 at 8:00 PM
Updated August 22, 2025
Site work and paving for a water / sewer project in Littleton, Colorado. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.
The work to be performed under this Contract consists of furnishing and installing all materials, equipment, accessories, and labor necessary for the following work at the Western Booster Pump Station: coordinate testing of the existing pump motor (P-102) and power cables between VFD No 2 and the MCC, demolish the existing VFD, extend the concrete pad to accommodate the new VFD, and install a new medium voltage VFD. Work also includes installing new conduit with a signal cable between the new VFD and the PLC panel network switch. The Bidder to whom a contract is awarded will be required to furnish "Performance and Maintenance" and "Labor and Material Payment" bonds to the District. The "Performance and Maintenance" and "Labor and Material Payment" bonds shall be furnished in the amount of 100 percent of the contract, in conformity with the requirements of the Contract Documents. Doc note: Project bid documents must be downloaded from online which will add your company to the online. . Bidders will be charged a fee of $42 to submit a bid electronically. For this project, bids will only be received and accepted via the online electronic bid service through online. The District reserves the right to reject any and all proposals, or to accept that proposal or combination of proposals, if any, which in its sole and absolute judgment, will under all circumstances best serve the District's interest. No proposal will be accepted from any firm, person, or corporation, who is a defaulter as to surety or otherwise, or is deemed incompetent, irresponsible, or unreliable by the District Board of Directors. Question Deadline 07/01/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered The project includes: Coordinate testing of the existing pump motor, P-102, and power cables between the existing VFD, VFD No 2, and the existing MCC. Demolish the existing medium voltage variable frequency drive (VFD) for Pump Number 2 at the Western Booster Pump Station. Demolish the load side cable for Pump Number 2. Extend existing concrete housekeeping pad for new VFD dimensions. Install a new medium voltage VFD. Utilize existing conduit to install a new load side cable. Install new conduit with signal cable between the new VFD and the existing PLC panel network switch. Terminate existing control and signal wires at the new VFD. Test, startup, and commission the new VFD to confirm operation of Pump Number 2.
Award
Water / Sewer
$694,160.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 28, 2025
6875 Business Center Dr, Littleton, CO
Related To This Project
Littleton, CO
Bid Date: Aug 07 2025
Littleton, CO
Bid Date: Aug 07 2025
Littleton, CO
Bid Date: Jul 17 2025
Littleton, CO
--
Littleton, CO
Bid Date: Aug 05 2025
Littleton, CO
Bid Date: Aug 15 2025
Littleton, CO
Bid Date: Aug 05 2025
Littleton, CO
Bid Date: Sep 05 2025
Littleton, CO
Bid Date: Jul 16 2025
Littleton, CO
Bid Date: Jun 20 2025
Littleton, CO
Bid Date: Jul 02 2025
Littleton, CO
Bid Date: Jun 27 2025
Littleton, CO
Bid Date: Jul 07 2025
Littleton, CO
Bid Date: Jun 27 2025
Littleton, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
