Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated January 7, 2026
Renovation of a water / sewer project in Littleton, Colorado. Completed plans call for the renovation of a 8,400-square-foot, two-story above grade water / sewer project.
**As of September 15th, 2025, the project was awarded to GH Phipps Construction Company but the awarded amount is not available.** Allen Water Treatment Plant Office Improvements - Phase 2 New Two-Story Office Building within the Existing Charles Allen Water Treatment Plant Site. Reference Number 0000391432 Project No. DN52.130.000-125-R1 The City of Englewood Utilities Department ("the City" or "City") is seeking written proposals from qualified Contractors to Construct the second phase of the Office Improvements Project at the Allen Water Treatment Plant located at 1500 W Layton Ave, Englewood, CO 80110. The Office Improvements Project Phase 2 at the City of Englewood Allen Water Treatment Plant facility includes a new two-story, approximately 8,400 square foot office building meant to house approximately 24 staff, including Department Directors, Administrative, Business Solutions, Engineering, and Environmental Compliance personnel. The site for this new building is located on the south side of the Allen Water Treatment Plant campus and will be built over an area previously reserved for a sludge drying bed. Construction will include demolition of an existing stem wall that currently borders the drying bed. There will be additional site work associated with this project to provide security access gates, utility connections, and re-paving of the area surrounding the future office building Anticipated Notice to proceed September 2025 Question Deadline 07/10/2025 at 2:00 PM MT Questions are submitted online No, Once the question period expires, the addendum will be posted on the City's online Strategic Sourcing platform. Verbal questions during the recommended pre-proposal meeting and site visit will be screened for applicability and, as applicable, responded to in an addendum. All questions during the procurement period must be directed in writing to: Trudi Peepgrass, NIGP-CPP, CPPB Procurement & Contracts Manager Finance Department City of Englewood 1000 Englewood Parkway, Englewood, CO 80110 303-762-2419 tpeepgrass@englewoodco.gov Pre-Proposal Meeting: This is a locked facility. Please arrive at least 10 minutes early to ensure you are at the location prior to the start of the meeting. If you are late, you will not be able to participate in the meeting. There will be no exceptions. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %
Award
Water / Sewer
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
