BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Renovation of a water / sewer project in Littleton, Colorado. Completed plans call for the renovation of a 8,400-square-foot, two-story above grade water / sewer project.

Allen Water Treatment Plant Office Improvements - Phase 2 New Two-Story Office Building within the Existing Charles Allen Water Treatment Plant Site. Reference Number 0000391432 Project No. DN52.130.000-125-R1 The City of Englewood Utilities Department ("the City" or "City") is seeking written proposals from qualified Contractors to Construct the second phase of the Office Improvements Project at the Allen Water Treatment Plant located at 1500 W Layton Ave, Englewood, CO 80110. The Office Improvements Project Phase 2 at the City of Englewood Allen Water Treatment Plant facility includes a new two-story, approximately 8,400 square foot office building meant to house approximately 24 staff, including Department Directors, Administrative, Business Solutions, Engineering, and Environmental Compliance personnel. The site for this new building is located on the south side of the Allen Water Treatment Plant campus and will be built over an area previously reserved for a sludge drying bed. Construction will include demolition of an existing stem wall that currently borders the drying bed. There will be additional site work associated with this project to provide security access gates, utility connections, and re-paving of the area surrounding the future office building Anticipated Notice to proceed September 2025 Question Deadline 07/10/2025 at 2:00 PM MT Questions are submitted online No, Once the question period expires, the addendum will be posted on the City's online Strategic Sourcing platform. Verbal questions during the recommended pre-proposal meeting and site visit will be screened for applicability and, as applicable, responded to in an addendum. All questions during the procurement period must be directed in writing to: Trudi Peepgrass, NIGP-CPP, CPPB Procurement & Contracts Manager Finance Department City of Englewood 1000 Englewood Parkway, Englewood, CO 80110 303-762-2419 tpeepgrass@englewoodco.gov Pre-Proposal Meeting: This is a locked facility. Please arrive at least 10 minutes early to ensure you are at the location prior to the start of the meeting. If you are late, you will not be able to participate in the meeting. There will be no exceptions. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Post-Bid

Water / Sewer

$700,000.00

Public - City

Renovation

79

37

77

10

Subscribe For Documents

117 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
64
Bidding Soon
1,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 10, 2025

Project location map

1500 W Layton Ave, Littleton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.