BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Demolition and site work for a residential development in Los Altos Hills, California. Completed plans call for the demolition of a residential development; and for site work for a residential development.

**As of July 11,2025 , this project has not yet been awarded. The project is expected to be awarded on August 26,2025.** License Requirements C-21 and HAZ Start/Delivery Date 9/15/2025 Project Duration 30 calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 06/30/2025 5:00 PM (PDT) Online Q&A Yes All questions relative to this project prior to the opening of bids shall be in writing and directed to the CIP Manager, City of Los Altos, 1 N. San Antonio Road, Los Altos, CA 94022. Contact Information Contact Info Scott Reeves 650-947-2769 sreeves@losaltosca.gov Contact Information Contact Info Scott Reeves 650-947-2769 sreeves@losaltosca.gov. The project generally includes abatement of lead and asbestos materials, demolition and removal of the Caretaker House, capping of associated utilities, and returning the footprint to a natural state. The City of Los Altos, Santa Clara County, California, invites sealed bids for furnishing labor, material and equipment required to complete the project in the particular locations, of the forms, sizes and dimensions and of the materials and to the lines and grades and at the elevations as shown and delineated upon the plans and specifications made therefore. The following information is presented to indicate the size of the project and no warranty is made or intended to final quantities: The work shall consist of implementation of measures to achieve conformance with requirements of the municipal stormwater permit. In general, the following goals should be met: Prohibition of illicit discharge (non-rainwater) into the storm drain system. Construction of any and all necessary systems to eliminate contaminants from entering the storm water system. Clean up and control of work site materials, spoils and debris. Removal of contaminants produced by the project.

Bid Results

Residential Subdivision

$86,000.00

Public - City

Demolition, Site Work

29

15

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
170
Bidding Soon
2,459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 15, 2025

Project location map

482 University Ave, Los Altos Hills, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.