BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a road / highway in Harlingen, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

District/ Division Pharr County (Controlling Project) Cameron Let Type Statewide Let - CST Highway (CCSJ) Odoms Ln Type of Work (Controlling Project) Hazard Elimination & Safety Bidder pre-qualification waiver :No Project Description Project will construct more than 1 mile of 5 ft wide bicycle lanes along 1st St SW from Hearne Ave to Sherman St. SB lane will continue north of Kaufman St. NB lane will turn east on Sherman St and North on Main St. Working Day Type (CCSJ) Working Days Max. Maximum Number Of Working Days 182 "Prebid Q & A will be posted in 44 days & 8 hours. Please contact district with current questions." Limit From: On Odoms Rd., From Baker Potts Rd. Limit to: 0.18 Miles East of Altas Palmas Rd. Guaranty: $27,000 TXDOT - Hazard Elimination & Safety - Odom Ln Contractor questions on this project are to be addressed to the following individual(s): Andres Espinoza, P.E., San Benito Area Engineer; Andres.Espinoza@txdot.gov Gabriel Villareal, P.E., Assist. Area Engineer; Gabriel.Villarreal@txdot.gov Contractor questions will be accepted through email, phone, and in person by the above individuals. Questions may also be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address: https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page. The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.

Award

Roads / Highways

$978,047.00

Public - State/Provincial

Paving, Site Work

190

7

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
31
Bidding Soon
379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

October 7, 2025

Project location map

Odom Ln, Harlingen, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.