BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Renovation of a municipal facility in Cheyenne, Wyoming. Completed plans call for the renovation of a municipal facility.

The City of Cheyenne Ice Slicer building's fabric cover and steel truss & column frame is to be removed. Preserve the existing concrete stem walls footings and concrete slab for reuse. A new steel building frame will be installed inside the existing building footprint on new footings, tie beams and pilasters saw cut and anchored to the existing concrete infrastructure. The new frame will consist of Z-girt purlins and covered with an exposed fastener pre-finished siding and roof system. Project Location(s): a. Street and Alley Division: 110 Cleveland Place, Cheyenne, WY 82007. The City of Cheyenne Ice Slicer building's fabric cover and steel and truss column frame is to be removed. Preserve the existing concrete stem walls footings and concrete slab for reuse. A new steel building frame will be installed inside the existing building foot print on new footings, tie beams and pilasters saw cut and anchored to the existing concrete infrastructure. The new structure will consist of z-girt purlins and covered with an exposed fastener pre-finished siding and roof system. *The value for this project is based on a financial range of $500,000 - $1,000,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Submission Deadline July 8, 2025, 5:00pm

Post-Bid

Municipal

$1,000,000.00

Public - City

Renovation

13

28

9

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
52
Bidding Soon
598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

110 Cleveland Pl, Cheyenne, WY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.