Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Renovation of a municipal facility in Burnaby, British Columbia. Conceptual plans call for the renovation of a municipal facility.
The objectives of the project are to: a) Design and renew components of the existing BAS facility driven by facilities maintenance needs to extend the service life of the building; b) Conduct renewal work in phases to minimize disruption to operations; c) Realize energy savings opportunities; d) Ensure safe and healthy animal welfare during renewal work; and, e) Maintain safe site access, parking and operation of the facility during renewal work. Located at 3202 Norland Avenue, Burnaby, the existing 5,242 ft2 facility is in poor physical condition and in need of major like-for-like renewal work to extend its service life. Renewal work will be implemented in phases while the facility remains in operation. The original two-storey wood-framed building was built in 1969 with a masonry building extension added in 1982. See Appendix D - As-Built Drawings. In early 2025, a Building Condition Assessment Report (Appendix E) was completed with the following report findings that provide a general overview of potential renewal scope anticipated on the project, including but not limited to: 1) Parking lot repaving; 2) Exterior Lighting replacements; 3) Interior Lighting replacements; 4) Accessibility improvements; 5) Minor millwork repairs; 6) Structural upgrades to substructure; 7) Roofing replacement; 8) Domestic hot water tank replacement; 9) HVAC repairs; and 10) Exterior cladding and window replacement. TIMELINE: Project was cancelled. A new building project ios followed under a separate report.
Project Abandoned
Municipal
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
October 31, 2025
3202 Norland Ave, Burnaby, BC
Related To This Project
Burnaby, BC
Bid Date: Jul 31 2025
Burnaby, BC
Bid Date: Aug 05 2025
Burnaby, BC
--
Burnaby, BC
Bid Date: Aug 01 2025
Burnaby, BC
Bid Date: Aug 14 2025
Burnaby, BC
Bid Date: Aug 15 2025
Burnaby, BC
--
Burnaby, BC
Bid Date: Aug 11 2025
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
Bid Date: Aug 08 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
