BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in Redlands, California. Completed plans call for site work for a water / sewer project.

The scope of work for this project consists of the rehabilitation of approximately 8,500 linear feet of 8" and 6" sewer pipelines. The work shall consist of furnishing and installing CIPP, removing and replacing existing pipe, spot repair, manhole replacement, and appurtenances; testing all pipelines; all traffic control; protecting in place or removing and replacing all existing utilities, manholes, trees, and public and private improvements; replacing destroyed survey monuments; disposing of excess material and restoring all areas and improvements to pre-construction conditions. Bid(10.0%), Performance(100.0%), Payment(100.0%) Question Deadline 06/23/2025 at 2:00 PM PT Online Q&A Yes Liquidated Damages $500 PER DAY Ail questions related to this project shall be directed to Bryan Arellano, Project Manager, at 909-798- 7584 Ext 8. It shall be understood, however, that no specification interpretations will be made by telephone, nor will any products be considered for approval prior to award ofthe Contract. Changes, if any, will be made by addendum prior to opening ofBids. Pre-Bid Meeting No.

Bid Results

Water / Sewer

$1,494,516.00

Public - City

Site Work

10

17

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
188
Bidding Soon
3,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

September 1, 2025

Project location map

Multiple Locations, Redlands, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.