BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2025 at 8:00 PM

Updated November 7, 2025

Site work for a civil project in Alexandria, Minnesota. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

**As of July 24, 2025, the project was awarded to Midwest Contracting, LLC., with an awarded amount of $1,378,023.95.** Centreline Culverts, Bridge Replacement, and Grading on SAP 021-614-018 (CSAH 14). Major Items: Clearing 1.23 Acre Grubbing 1.23 Acre Salvage Pipe Culvert 132 Linear Feet Salvage Precast 12' X 6' Box Culvert 128 Linear Feet Remove Pipe Culverts 1,248 Linear Feet Excavation - Common 2,154 Cubic Yard Common Embankment (CV) 18,231 Cubic Yard Aggregate Base, Class 5 13,477 Ton Full Depth Reclamation 13,267 Square Yards 16' X 9' Box Culvert End Section 2 Each 16' X 9' Precast Concrete Box Culvert Class II 78 Linear Feet Install 12' X 6' Precast Concrete Box Culvert 92 Linear Feet R.C. Pipe Culvert 1,690 Linear Feet Random Riprap Class III 153 Cubic Yard Traffic Control 1 Lump Sum Seeding 7.29 Acre Bids must be accompanied by a Bidder's Bond or a Certified Check in an amount equal to at least 5% of the total bid made payable to Douglas County. Bids must be sealed and shall be clearly marked "SAP 021-614-018". Douglas County reserves the right to reject any or all bids and to waive any irregularities thereof.

Award

Bridges / Tunnels

$1,378,024.00

Public - County

Site Work

32

3

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
25
Bidding Soon
440
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

CSAH 14, Alexandria, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.