BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Emporia, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The envelope should be plainly marked on the outside RD. P BRIDGE BID . Bids received after this time will be returned unopened. The Project generally consists of construction of a new 100 -125 -100 WMCC bridge and supporting roadway grading. Common Excavation 3,710 C.Y. Contractor Furnished Exc. 2,997 C.Y. Rock Excavation 142 C.Y. Compaction of Earthwork 4,837 C.Y. Concrete (Grade 4.0)(AE) 461 C.Y. Reinforcing Steel (Grade 60) 118,330 Lbs. Structural Steel 263,000 Lbs. Piles HP12x53 400 L.F. Predrilled Pile Holes 63 L.F. Drilled Shaft (48 )(Cased) 108 L.F. Slope Protection 544 C.Y. Surfacing Material (AB-3) 1,480 Tons Seeding & Erosion Control Lump Sum L.S. Traffic Control Lump Sum L.S. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. Bid security shall be furnished in accordance with the Instructions to Bidders. Wage Rate Requirements: Prevailing wage rates do not apply to this project. The Owner reserves the right to reject any and all bids and to waive any irregularities therein. A. Contract Type: Unit Price B. Work under this contract shall include all materials and labor associated to construct the project as specified and indicated on the Drawings. C. All work to be done by the Contractor, as described above and specified in the contract documents and also any and all minor details of the work not specifically mentioned but obviously necessary for the proper completion of the work, such as the proper connection of new work to old, shall be considered as incidental to and so being a part of and included with the work for which prices are enumerated in the contract documents. The Contractor will not be entitled to any additional compensation unless specifically stated otherwise.

Award

Bridges / Tunnels

$1,990,209.00

Public - County

Demolition, New Construction, Paving, Site Work

78

10

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
65
Bidding Soon
736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

Rd P, Emporia, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.