Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Emporia, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The envelope should be plainly marked on the outside RD. P BRIDGE BID . Bids received after this time will be returned unopened. The Project generally consists of construction of a new 100 -125 -100 WMCC bridge and supporting roadway grading. Common Excavation 3,710 C.Y. Contractor Furnished Exc. 2,997 C.Y. Rock Excavation 142 C.Y. Compaction of Earthwork 4,837 C.Y. Concrete (Grade 4.0)(AE) 461 C.Y. Reinforcing Steel (Grade 60) 118,330 Lbs. Structural Steel 263,000 Lbs. Piles HP12x53 400 L.F. Predrilled Pile Holes 63 L.F. Drilled Shaft (48 )(Cased) 108 L.F. Slope Protection 544 C.Y. Surfacing Material (AB-3) 1,480 Tons Seeding & Erosion Control Lump Sum L.S. Traffic Control Lump Sum L.S. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. Bid security shall be furnished in accordance with the Instructions to Bidders. Wage Rate Requirements: Prevailing wage rates do not apply to this project. The Owner reserves the right to reject any and all bids and to waive any irregularities therein. A. Contract Type: Unit Price B. Work under this contract shall include all materials and labor associated to construct the project as specified and indicated on the Drawings. C. All work to be done by the Contractor, as described above and specified in the contract documents and also any and all minor details of the work not specifically mentioned but obviously necessary for the proper completion of the work, such as the proper connection of new work to old, shall be considered as incidental to and so being a part of and included with the work for which prices are enumerated in the contract documents. The Contractor will not be entitled to any additional compensation unless specifically stated otherwise.
Award
Bridges / Tunnels
$1,990,209.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
August 7, 2025
Rd P, Emporia, KS
Related To This Project
Emporia, KS
Bid Date: Jul 18 2025
Emporia, KS
Bid Date: Aug 26 2025
Emporia, KS
Bid Date: Aug 05 2025
Emporia, KS
Bid Date: Sep 10 2025
Emporia, KS
Bid Date: Sep 02 2025
Emporia, KS
Bid Date: Sep 17 2025
Emporia, KS
Bid Date: Sep 22 2025
Emporia, KS
Bid Date: Jun 26 2025
Emporia, KS
Bid Date: May 21 2025
Emporia, KS
Bid Date: Apr 25 2025
Emporia, KS
Bid Date: May 13 2025
Emporia, KS
Bid Date: Jan 06 2022
Emporia, KS
Bid Date: Apr 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
