BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work for a water / sewer project in Westminster, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000390311 Bid Intent Not Available The City of Westminster, hereinafter referred to as the City, is inviting qualified contractors to submit bids for the construction of the Westminster Blvd Raw Water Pipeline Extension Project. This IFB outlines the scope of work, requirements, and conditions for bidding. The successful Bidder, hereinafter referred to as the Contractor, will enter into a contract with the City for the completion of the work outlined herein. The City's detailed Contract Documents and Requirements are attached separately. The project includes furnishing, delivering, constructing, installing, connecting, and hydrostatically testing approximately 11,000 linear feet (2.1 miles) of 36-inch fully welded steel waterline including all appurtenances and connections for raw water conveyance to the New Drinking Water Facility. The project will include connections to the existing 42-inch steel and 36-inch PCCP Standley Lake Pipelines, open cut installation, and trenchless installations under BNSF railroad and US-36. An add alternate of trenchless installation under Westminster Blvd is also included. Project Location: 7600 Block of 92nd Avenue to the 9900 Block of Westminster Blvd Estimated Duration: Substantial Completion - 18 months from Notice to Proceed Final Completion - 20 months from Notice to Proceed Question Deadline 07/03/2025 at 4:00 PM MT Questions are submitted online Yes, All questions must be submitted via online no later than the date and time specified in the Schedule of Events. Responses will be posted on online for public viewing. Except for pre-bid meetings or site visits, communication with City personnel outside of the Procurement staff may result in disqualification of the Bidder's submission. Bonding Requirements - Bid Bond 5 % Upon award of the contract, the Contractor must provide both a Performance Bond and a Payment Bond, each equal to 100% of the total contract price. These bonds must be submitted within 10 business days after a City contract is executed. T The City reserves the right to reject any or all proposed modifications.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

125

19

8

6

Subscribe For Documents

121 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
56
Bidding Soon
1,151
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

Westminster Blvd, Westminster, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.