BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2025 at 8:00 PM

Updated July 11, 2025

This is a service / maintenance or supply contract in Westminster, Colorado. Contact the soliciting agency for additional information.

Reference Number 0000389899 Bid Intent Not Available Purchase Type: Duration: 1 year Option: 4 one-year renewal options The City of Westminster is inviting qualified contractors to submit bids for the removal and disposal of accumulated water treatment residuals and biosolids from the City's water treatment facilities. This IFB outlines the scope of work, requirements, and conditions for bidding. The successful Bidder, hereinafter referred to as the Contractor, will enter into a contract with the City for the completion of the work outlined herein. The project includes removal and disposal services for accumulated water treatment residuals from the Semper Water Treatment Facility (Semper) backwash reclaim lagoons and biosolids from digesters at the Big Dry Creek Wastewater Treatment Facility (BDCWWTF). Locations: Semper Water Treatment Facility 8900 Pierce Street Westminster, CO 80021 Big Dry Creek Wastewater Treatment Facility 13150 Huron Street Westminster, CO 80234 Waste accumulates in the City's water and wastewater facilities as a normal part of the treatment process. This waste must be disposed of on a regular basis to ensure that treatment processes remain uninterrupted and to allow staff the opportunity to inspect and repair process equipment. The waste includes mineral buildup in the digester tanks at BDCWWTF and accumulated water treatment sludge at Semper. In 2024, approximately 550,000 gallons of sludge was removed from the Semper lagoons and between 50,000 and 80,000 gallons were removed from BDCWWTF. It is anticipated that there will be a greater amount being removed this year. Question Deadline 06/27/2025 at 5:00 PM MT Questions are submitted online Yes, The City is not bound by, and bidders shall not rely on, any oral interpretations or clarifications of this IFB. All questions must be submitted via online no later than the date and time specified in the Schedule of Events. Responses will be posted on online for public viewing. Except for pre-bid meetings or site visits, communication with City personnel outside of the Procurement staff may result in disqualification of the Bidder's submission.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

Multiple Locations, Westminster, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.