Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work for a water / sewer project in Westminster, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000390311 Bid Intent Not Available The City of Westminster, hereinafter referred to as the City, is inviting qualified contractors to submit bids for the construction of the Westminster Blvd Raw Water Pipeline Extension Project. This IFB outlines the scope of work, requirements, and conditions for bidding. The successful Bidder, hereinafter referred to as the Contractor, will enter into a contract with the City for the completion of the work outlined herein. The City's detailed Contract Documents and Requirements are attached separately. The project includes furnishing, delivering, constructing, installing, connecting, and hydrostatically testing approximately 11,000 linear feet (2.1 miles) of 36-inch fully welded steel waterline including all appurtenances and connections for raw water conveyance to the New Drinking Water Facility. The project will include connections to the existing 42-inch steel and 36-inch PCCP Standley Lake Pipelines, open cut installation, and trenchless installations under BNSF railroad and US-36. An add alternate of trenchless installation under Westminster Blvd is also included. Project Location: 7600 Block of 92nd Avenue to the 9900 Block of Westminster Blvd Estimated Duration: Substantial Completion - 18 months from Notice to Proceed Final Completion - 20 months from Notice to Proceed Question Deadline 07/03/2025 at 4:00 PM MT Questions are submitted online Yes, All questions must be submitted via online no later than the date and time specified in the Schedule of Events. Responses will be posted on online for public viewing. Except for pre-bid meetings or site visits, communication with City personnel outside of the Procurement staff may result in disqualification of the Bidder's submission. Bonding Requirements - Bid Bond 5 % Upon award of the contract, the Contractor must provide both a Performance Bond and a Payment Bond, each equal to 100% of the total contract price. These bonds must be submitted within 10 business days after a City contract is executed. T The City reserves the right to reject any or all proposed modifications.
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
August 18, 2025
Westminster Blvd, Westminster, CO
Related To This Project
Westminster, CO
Bid Date: Jul 10 2025
Westminster, CO
Bid Date: Jul 31 2025
Westminster, CO
Bid Date: Jul 17 2025
Westminster, CO
Bid Date: Jul 17 2025
Westminster, CO
--
Westminster, CO
--
Westminster, CO
Bid Date: Aug 07 2025
Westminster, CO
Bid Date: Aug 07 2025
Westminster, CO
Bid Date: Jul 07 2025
Westminster, CO
Bid Date: Jun 03 2025
Westminster, CO
Bid Date: May 22 2025
Westminster, CO
Bid Date: May 02 2025
Westminster, CO
Bid Date: May 22 2025
Westminster, CO
Bid Date: May 06 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed