BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 7, 2025

Site work for a water / sewer project in Ashtabula, Ohio. Completed plans call for site work for a water / sewer project.

** As of August 05, 2025, project was awarded to A Morgan Building Group, with an awarded amount of $779,000 ** Bids shall be accompanied by bid security in the amount specified in the Bidding Documents, made payable to the Ashtabula Metropolitan Housing Authority. Question Deadline 07/03/2025 at 5:00 PM ET Questions and requests for substitutions shall be submitted to the Architects office . Direct questions to Rebecca Yakovic via email ryakovic@tcarchitects.com. The Housing Authority reserves the right to cancel any solicitation and to accept or reject in whole or in part any bid for good cause when it is in the best interest of the Housing Authority. PROJECT IDENTIFICATION A. The Project is: Bardmoor Estates Basement and Drainage Phase 2 Bardmoor Blvd. Ashtabula, Ohio 44004 1.3 RESTORATION AND NEW WORK A. Work under this contract shall consist of furnishing all labor, access to the work, materials, and equipment necessary to perform exterior and interior renovations listed below. Follow this specification, BIA, NCA requirements, all building codes and regulatory requirements. If a conflict is found within the contract documents, the most stringent requirement shall apply. Install all items as identified and appropriate. The work will include, but not necessarily be limited to the following: a. Wall and concrete slab repairs b. Painting c. Basement wall waterproofing d. Connection of downspout drains to storm sewer e. Site drainage, including revisions to the storm lines on site f. Asphalt replacement where needed at adjusted grades g. Concrete sidewalk replacement where needed at adjust grades h. Concrete porch / stair replacement i. Grading j. Excavation and export k. Grass seeding 1.4 WORK SEQUENCE A. Work shall proceed in a continuous and orderly manner. B. The Contractor shall strive to minimize disruption to the building operations and occupancy during construction. C. All work shall be made usable for the tenant at the end of each work day with no exceptions.

Award

Water / Sewer

$779,000.00

Public - City

Site Work

20

18

2

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
110
Bidding Soon
1,721
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

Bardmoor Blvd, Ashtabula, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.