BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Renovation of a multi-residential development in Birmingham, Alabama. Completed plans call for the renovation of a multi-residential development.

CONTRACTOR agrees to Completely tear off all existing shingles Perform deck inspection Bid should include anticipation of replacing up to 3 sheets of decking on each building Install synthetic felt underlaying or equivalent Install architectural shingles to match existing roofs (calculated at approximately 40-45 squares for each roof) Change out old drip edge and install new drip edge Properly seal and caulk existing flashing and roof penetrations All debris removed and taken off EHA property reroofing at our Forest Hills complex which has 25 buildings - most are duplexes. Contractor will perform deck inspection, completely tear off all existing shingles, install synthetic felt underlaying or equivalent, install architectural shingles, replace existing drip edge, properly seal all roof penetrations and remove all debris. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated budget is $250,000 - $300,000

Award

Multi-Residential

$192,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
668
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

2615 Tempest Dr SW, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.