Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Site work and outdoor lighting for a road / highway in Birmingham, Alabama. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.
All bids must be on a lump sum basis. Bids are to be submitted in duplicate on the Proposal Form provided with specifications. No pre-qualification of bidders will be conducted prior to receiving bids. Under the Alabama State Code, Section 39-2-4, as amended by Act #97-225, it is required for any contract exceeding $50,000 that the Bidder submit with his bid, either a cashier's check, drawn on an Alabama bank, or a bid bond, executed by a surety authorized and qualified to make bonds in Alabama, payable to the City of Birmingham, in an amount (subject to a maximum of $50,000.00) equal to five percent (5%) of the bid. In order for a bid to be considered, it must be accompanied by an acceptable bid bond or cashier's check. Any bid submitted for an amount of $50,000 or more, the bidder must be a licensed general contractor in the State of Alabama in accordance with Section 34-8, of the Alabama State Code. Contractor's license number shall appear on the outside of the envelope used to submit bid. A Performance Bond in the amount of 100% of the contract amount and a Statutory Labor and Material Payment Bond in the amount of 100% of the contract amount will be required from the successful bidder at the signing of the contract. Also, proof of insurance will be required when the contract is signed. The City will review bonds and insurance and execute the contract within twenty (20) days unless the successful contractor agrees to an extension in writing. Since award may not be made within thirty (30) days, no bid may be withdrawn for a period of sixty (60) days after the date of the bid opening. The City reserves the right to reject any or all bids submitted, and to waive any informalities. Bidders are expected to prepare their bid to include all necessary material, labor, bonds, permits, overhead, profit, taxes, insurance, etc. costs. It is not the City's obligation to bring mistakes/omissions in bid to bidder's attention. If after bid opening, a bidder determines he has a mistake in bid, he may seek withdrawal of his bid without forfeiting his bond, if the request is in writing within three (3) work days after the bid opening, and is accompanied by clear and convincing evidence of the mistake. All cashier's checks or bid bonds will be returned immediately after bids are checked and tabulated to all except the three (3) lowest bona fide bidders. Bid bonds shall be returned to the three (3) lowest bona fide bidders when the contract is signed, and performance and payment bonds and insurance are furnished by the successful bidder. If award is not made within fifteen (15) days after bid opening, all bid guarantees will be returned except for those of the potentially successful bidders. If after sixty (60) days, no award has been made, all bids shall be rejected, and the potentially successful bidder's guarantee will be returned unless the bidder agrees in writing to a time extension. If a time extension is effected, bidder may substitute any cashier's check for a satisfactory bid bond. Any contract resulting from this Invitation to Bid shall not be assignable without prior written consent of the City. Under no conditions shall the contract be assigned to an unsuccessful bidder whose bid was rejected as non-responsive and/or non-responsible. This project is subject to the requirements of the Birmingham Plan-Construction Industry Program, which is designed to encourage the utilization of Minority Business Enterprises and Disadvantaged Business Enterprises ("MBE/DBE") in City of Birmingham construction projects. Special attention is called to the requirement of all bidders to identify trades and activities for which it will solicit and accept bids from potential MBE/DBE subcontractors. Potential bidders are encouraged to contact the Birmingham Construction Industry Authority (BCIA) to request a list of potential subcontractors and submit the required MBE/DBE forms by contacting the Executive Director, Birmingham Construction Industry Authority at 601 37th Street South, Birmingham, AL, 35222; telephone (205) 324-6202 or info@bcia1.org. As a matter of public policy, the City of Birmingham agrees to make opportunities available to the maximum extent possible, to actively include Historically Underutilized Business Enterprises (HUBE's) such as architectural firms, engineering firms, investment banking firms, other professional consultant services providers, and construction contractors as part of business, economic and community revitalization programs. Question deadline - 11 July 2025 Questions should be received by the Architect at least five (5) days prior to the date set for receiving of bids.
Award
Roads / Highways
$194,800.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 8, 2025
40th St N & Richard Arrington Jr Blvd N, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Jul 24 2025
Birmingham, AL
Bid Date: Sep 30 2025
Birmingham, AL
Bid Date: Jul 16 2025
Birmingham, AL
Bid Date: Jul 24 2025
Birmingham, AL
Bid Date: Jul 07 2025
Birmingham, AL
Bid Date: Jul 23 2025
Birmingham, AL
Bid Date: Mar 02 2021
Birmingham, AL
Bid Date: Jul 09 2025
Birmingham, AL
Bid Date: Jun 25 2025
Birmingham, AL
Bid Date: Sep 04 2025
Birmingham, AL
Bid Date: Jul 02 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Aug 14 2025
Birmingham, AL
Bid Date: Jul 10 2025
Birmingham, AL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
