Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 5, 2025
Site work, paving and outdoor lighting for a transportation facility in Birmingham, Alabama. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and for outdoor lighting for a transportation facility.
Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of two new full power jet blast deflectors, sized to accommodate full engine run-ups for the KC-135 aircraft. The project will include but not be limited to the construction of new concrete paving systems, the relocation of existing flight line security lighting pole, and the relocation of flight line fuel system emergency shutoff controls. The work is required at the117th Air Refueling Wing, Sumter Smith National Guard Base, 5401 East Lake Blvd, Birmingham Alabama, 35217. The contract duration is 210 calendar days after Notice to Proceed. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 236220 which equates to a size standard of $45,000,000.00. Project magnitude is between $1,000,000 and $5,000,000. The date for the pre-bid conference is August 12, 2025, 10:00 am local time, the location to be provided in the solicitation. Interested contractors are highly encouraged to attend the pre-bid conference and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by August 26, 2025, at 12:00 PM local time via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil . Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states "By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded". In accordance with FAR 36.211(b), the following information is provided: The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. This project will not have sole source/brand name items. The contractor shall begin performance within 30 calendar days and complete it within 210 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/26/2025 via email to; william.hall.13@us.af.mil , and jonathan.werkmeister@us.af.mil. BDI Project No: M-BHM0718
Post-Bid
Transportation Terminals
$5,000,000.00
Public - Federal
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
November 3, 2025
5401 E Lake Blvd, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Jun 25 2025
Birmingham, AL
Bid Date: Aug 07 2025
Birmingham, AL
Bid Date: Jul 24 2025
Birmingham, AL
Bid Date: Sep 30 2025
Birmingham, AL
Bid Date: Jul 16 2025
Birmingham, AL
Bid Date: Jul 24 2025
Birmingham, AL
Bid Date: Jul 07 2025
Birmingham, AL
Bid Date: Jul 23 2025
Birmingham, AL
Bid Date: Jul 02 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Aug 14 2025
Birmingham, AL
Bid Date: Jul 10 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Jul 17 2025
Birmingham, AL
Bid Date: Jun 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
