BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and asbestos abatement for a medical facility in El Dorado, Arkansas. Completed plans call for site work for a medical facility; and for asbestos abatement for a medical facility.

As of September 11, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Labor, Materials, and Equipmentnecessary for the Complete Removal of the Identified Acm Bycompetent Persons Who Aretrained, Knowledgeable, Qualified,and Currently Licensed and Accredited in the Techniques Ofabatement, Handling and Disposalof Asbestos Containing Debris and Asbestos-contaminated Materials,and the Subsequent Cleaning Ofcontaminated Areas. The Abatement Contractor (Ac)will Furnish All Labor, Supervision,materials, Services, Insurance,equipment, Electricity, Lighting,and Emergency Lighting, Andwater Necessary for the Total Removal of the Areas of Acm Summarized in Table 1.0 (See Fullscope of Work at the Site Has No Power and Nowater. Should Additional Acm Orsuspect Be Encountered, Thesematerials Should Be Reported Tothe Owner. It Should Be Noted That the General Location, Description of Material, and Neshap Classification of The Identified Acm Were Provided in Snyder Environmental' S Asbestos Inspection Report From2015. The Identified Materialshave Been Exposed to Environmental Conditions and Vandalism That Could Have Impacted the Neshap Classification in the Provided Report. In Addition, Pipeinsulation Has Been Removed From Water Lines Throughout the Westwing and is Located on the Floor Inmultiple Locations. Removal Ofracm Impacted Debris Must Beincluded in the Abatement Activities. The Estimated Quantity Provided in the Above Table is Anestimate Based on the Approximate Square Footage of Impactedareas. These Quantities Are for Informational Purposes Only and Arebased on the Best Informationavailable at the Time of The Specification Preparation. The Ac Shall Satisfy Themselves as to the Actual Quantities to Be Abated. Additional Quantities of Acm Above Currentestimates, if Removed, Will Bedone So Only With Approval Fromthe Owner. The Ac is Responsiblefor Actual Quantities for Their Notifications. Nothing in This Sectionmay Be Interpreted as Limiting the Extent of the Work That May Otherwise Be Required by the Contract Documents. If Additionalwork is Determined to Be Required, It Will Be Performed at the Discretion of the Owner, and Only Afterwritten Approval From the Owner. Brownfield -- Southwest Arkansas Planning and Development District Compliance with Davis Bacon requiresweekly payment of federal prevailing wage rates for construction, repair, or alteration workfunded in whole or in part with the BRLP. All contractors or subcontractors shall submit certified payroll records each week for alllaborers during the course of the work and shall preserve them fora period of three years from thedate of completion of the contract.All contractors and subcontractorsare required to allow employees,to be periodically interviewed toverify they are receiving appropriate wage rates The AC and any subcontractorshall be liable for unpaid wages.In addition, such AC and subcontractor shall be liable to the UnitedStates for liquidated damages.Such liquidated damages shall becomputed with respect to each individual laborer, including watchmen and guards, employed inviolation in the sum of $31 foreach calendar day on which such individual was required or permitted to work in excess of the standard forty- hour workweekwithout payment of overtimewages.

Bid Results

Medical

$245,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
35
Bidding Soon
347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

470 E Oak St, El Dorado, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.