BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 10, 2025

Site work and new construction of a municipal facility in Schaumburg, Illinois. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

2561-03140 - RFQ for CMAR Services for DOTH District 1 Facility - 10000258747 The Cook County Department of Capital Planning and Policy is anticipating the construction of a new District 1 Maintenance Facility for the County Department of Transportation and Highway's (DOTH). This approximately 130,000 square feet facility on roughly six (6) acres is to be located at 2222 Hammond Drive, Schaumburg, IL 60196. Design is currently anticipated to begin late 2025. Construction is anticipated to start in 2027 and last approximately 18 months. Questions Due Date Online Portal Deadline to submit Questions Jun 16th 2025, 3:00 PM CDT Questions regarding this RFQ must be submitted via email to Rahel.Abraham@cookcountyil.gov Workforce Minority Journeyman and Apprentices: 30% Minority Laborers: 40% Women Journeyman and Apprentices: 5% Women Laborers: 5% MBE WBE Goods and Services 25% 10% Construction 24% 10% Professional Services 35% Overall The successful CM will provide comprehensive construction managementservicesforthis project identified in this RFQ and the Professional Services Agreement (PSA). The CM will be retained during the design phase to provide Pre-Construction Phase Servicessuch as constructability reviews, cost estimating, phase delivery approach support, value engineering reviews and validation of the schedule. The Owner will require bidding services and an early open book Guaranteed Maximum Price (GMP) at the completion of Contract Documents. It is the Owner's expectation that the CM will be able to deliver services, information, and benchmarking costs, which allow the Owner to make timely decisions in a compressed Project Delivery schedule. The new DOTH transportation support facility, which is anticipated to have multiple buildings, will provide space for office administration and furniture, vehicle and equipment repair services, vehicle fleet and equipment storage, salt storage and associated machinery, fueling and chemical de-icing activities, material(spoils) storage, and adequate parking for employee vehicles, county vehicles, and public vehicles. Based on preliminary assessments, the following is anticipated: o Anticipated approximate square footage of occupiable space and conditioned storage: 110,000 o Anticipated approximate square footage of additional storage (salt dome, covered plow storage, material storage bins): 20,000SF o Site Acreage: approximately six (6)

Post-Bid

Municipal

$30,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
299
Bidding Soon
3,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

March 9, 2026

Project location map

2222 Hammond Dr, Schaumburg, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.