BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and paving for a road / highway in Redding, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

127EAW25R0042 - Monument Road Repair 4N47 - A00001 - RFI Responses Shasta-Trinity National Forest This project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to repair roads damaged by the Monument Fire and suppression activities on 4N47 road at the Shasta Trinity National Forest. The work involves asphalt road replacement, vegetation removal, base repairs and full depth reclamation, and other related activity due to heat damage, base failure, fire damage, and suppression activities. The project aims to restore the roads and features to a functional state that meets standards for public use, ensuring safety and usability of the roads through necessary repairs and alterations. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON Starting from eureka way in Redding, California, head north on Ca-273/eureka way for about 7.6 miles. Continue onto ca-299 west and drive for approximately 58.7 miles. Take the exit for Corral Bottom Road and proceed for about 5.6 miles, which should take Around 14 minutes. Turn left onto corral bottom road, then make a slight right to stay on corral bottom road. Continue For about 5.5 miles to reach your final destination 4N47. GPS coordinates 40.7119004. -123.2864034. This purpose of this solicitation amendment is to post RFI round 1 responses, revised schedule of items, and water drafting info. Attached are "127EAW25R0042 - RFI Official Responses - 1", "2. Schedule of Items - REVISED 7-28-2025, and "Water Drafting Specifications" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. 127EAW25R0042 - Monument Road Repair 4N47 Shasta-Trinity National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, July 21st, 2025. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,177,880.00

Public - Federal

Paving, Site Work

18

10

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
95
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 4, 2025

Project location map

3644 Avtech Pkwy, Redding, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.