BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Renovation of a mixed-use development in Pleasanton, California. Completed plans call for the renovation of a fire / police facility; and library.

Acceptance by City Council, Filing Notice of Completion, and Release of Retention and Bonds; Estimated Duration is Three Months Re-bid the City of Pleasanton is Seeking a Re-bid Request for Proposals for a Turnkey Solution for the Retrofit and Replacement of the City's Existing Fire Alarm Systems at the Public Works Department Corporation Yard, the Library, and the Police Station, Totaling 12 Buildings and Approximately 140,000 Square Feet. The Work Does Not Anticipate Changes to the Fire Sprinklers, but Some Buildings Require Minor Changes to the Fire Sprinkler System for Monitoring by the Fire Alarm System. The Fire Sprinkler Main Backflow Device at the Library's Exterior Will Be Replaced With an Above-ground Device. A Paging/communication System Will Be Added for the Corporation Yard Facilities. The Existing Fire Alarm Control Systems Are Outdated and No Longer in a Serviceable Condition. The Fire Alarm Work Shall Include but Not Be Limited to: Reviewing Existing Systems, Designing Updated Systems, Obtaining Permits, Replacing the Fire Alarm Panel, Adding Dedicated Electrical Feed to Relocated Panels, Replacing All Conductors, Replacing Detectors and Notification Devices in Existing Locations, Adding Devices and Conductors Where Required by Code or Project Description, Adding Conduit Where Required, and Patching and Painting of Existing Walls and Ceilings Where Necessary. The Work Will Take Place While Buildings Are Occupied by Staff and the Public With Extra Care and Special Working Hours Required. The Estimated Project Cost is $1.2 Million for All Three Locations. The City of Pleasanton (City) Anticipates Working With a Single Qualified Bidder Through These Milestones of Activity: 1. Investigation, Design, and Permits; Estimated Duration is Three Months After City Council Award of Contract and Written Notice of Award. 2. Scheduling, Shop Drawings, Fabrication, Mobilization, and Installa- Tion; Estimated Duration is Five Months After Written Notice to Pro- Ceed. 3. Testing and Fire Marshal Approval; Estimated Duration is One Month. Any Questions Related to This Rfp Shall Be Submitted in Writing. No Oral Question or Inquiry About This Rfp Shall Be Accepted. Questions Shall Be Submitted Before 2:00 P.m. Wednesday, August 13, 2025, to the Attention of Tom Mucha, Associate Engineer, via Email at Tmucha@cityofpleasantonca.gov.

Award

Fire / Police

$745,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
112
Bidding Soon
3,307
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

October 15, 2025

Project location map

Multiple Locations, Pleasanton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.