BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated July 4, 2025

Site work for a fitness / recreation center in Saint Paul, Minnesota. Completed plans call for site work for a fitness / recreation center.

City of Saint Paul Parks Department is looking for bids on Linwood Rec Center Site Improvements - The project shall consist of all work described in the plan sheets and specifications for the construction of site improvements at the Linwood Recreation Center including specified demolition and earthwork, new paths and parking areas, new retaining walls, new courts and recreation fields, stormwater management areas, utilities, irrigation, site furnishings, plantings, and site restoration. Question Deadline 06/25/2025 at 12:30 PM CT All substitution requests must be submitted through electronically. A complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation must be emailed to the buyer Queenie.Tran@ci.stpaul.mn.us before the end of the question period. Addenda, if necessary, will be posted on Thursday, June 26, 2025. The City reserves the right to reject any and all bids and to waive any bids received without explanation. 1. Install stabilized rock construction entrances. 2. Install perimeter erosion control BMP's (silt fence, bio-logs, etc). 3. Install temporary construction fencing at infiltration areas and other areas not be disturbed. 4. Install inlet protection throughout project area and downstream inlets. 5. Construct temporary sediment basins/traps as necessary. 6. Strip and stockpile topsoil. 7. Complete rough grading of site. 8. Stabilize denuded areas and stockpiles. 9. Install site utilities. 10. Install temporary inlet protection at newly installed catch basins/inlets. 11. Install curb and gutter and pavement sections. 12. Place topsoil and final grading of areas to be vegetated. 13. Remove accumulated sediment from basins / ponds. 14. Final grade pond and infiltration areas, including soil de-compaction as specified. 15. Complete stormwater basin as-built surveys (as required by project specifications and/or local jurisdictional authorities). 16. Complete permanent stabilization including plantings, seeding, and mulch. 17. Upon completion of construction activity and satisfactory vegetation establishment, remove remaining temporary erosion and sediment control BMPs. 18. Reseed / restore any areas disturbed during BMP removal. PROJECT NUMBER ENC 8602 32% Minority total project hours 20% Female total project hours 5% to minority-owned business enterprises (MBE) 10% to woman-owned business enterprises (WBE) 10% to other small business enterprises (SBE)

Post-Bid

Fitness / Rec Centers

Public - City

Site Work

33

15

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
131
Bidding Soon
1,556
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

860 St Clair Ave, Saint Paul, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.