Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2025 at 8:00 PM
Updated August 16, 2025
Renovation of a municipal facility in Shawnee, Oklahoma. Completed plans call for the renovation of a municipal facility.
**As of August 14, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project Description: The project consists of restoration and or replacement of the exterior historical limestone, exterior historical stone steps, building perimeter sealant envelop, exterior concrete, roofing, flag pole, and associated electrical connections / fixtures at the Courthouse located at 325 North Broadway Avenue, Shawnee, OK 74801. Bid Package #01 Exterior Site Concrete Bid Package #02 Historical Limestone Masonry (Qualified Contractors Only) Bid Package #03 Historical Stone Step Masonry (Qualified Contractors Only) Bid Package #04 Exterior Building Envelop Sealants Bid Package #05 Roof Replacement Bid Package #06 Flag Pole Installation Availability of Bidding Documents: Contract documents will be on file at the Construction Manager s Office, Construct Connect/iSqFt, Southwest Construction News and Reidprographics. Bidders may also obtain electronic access to bid documents by applying to the office of the Construction Manager. Pre-Bid Conference: A non-mandatory pre-bid conference will be held on Tuesday, July 1st, at 10:30 am located at project site at 325 North Broadway Avenue, Shawnee, OK 74801. Duration of Offer: No bidder may withdraw his proposal within sixty (60) days after the date of the opening thereof. Notes: Subcontract bids over $50,000 will be required to include the cost of Performance, Payment and Defect Bonds equal to one hundred percent (100%) of their bid amount. Additional bid packages may be issued at a later date as required. Women-owned and minority business enterprises are encouraged to participate in this project. Subcontractors will be required to provide bid security in the form of a Bid Bond or other statutory permissible method in the amount of five (5%) percent of the bid amount if the bid is in excess of fifty thousand ($50,000) dollars. The Owner expressly reserves the right to waive any formalities and to reject any or all bids. Said bids will be publicly opened and read aloud following the time stated above. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and Holidays, before the time set for opening bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. *Addendum 1 has been issued. Bid Result: B.P. #1.0 - Limestone Restoration - Frontier Waterproofing $39,435.00 B.P. #2.0 - Stone Step Restoration - Frontier Waterproofing $101,465.00 B.P. #3.0 - Bldg Envelope Sealants - Frontier Waterproofing $15,000.00 B.P. #4.0 - Exterior Site Concrete - Kemery Contracting, LLC $86,900.00 B.P. #5.0 - Flagpole Installation - LBI $24,000.00 B.P. #6.0 - Roofing Replacement - TriVAN Roofing $191,000.00
Bid Results
Municipal
$456,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
August 11, 2025
325 N Broadway Ave, Shawnee, OK
Related To This Project
Shawnee, OK
Bid Date: May 13 2025
Shawnee, OK
Bid Date: Aug 18 2025
Shawnee, OK
Bid Date: Jul 31 2025
Shawnee, OK
Bid Date: Aug 01 2025
Shawnee, OK
Bid Date: Jul 23 2025
Shawnee, OK
Bid Date: Dec 11 2020
Shawnee, OK
Bid Date: Sep 11 2020
Shawnee, OK
Bid Date: Aug 28 2025
Shawnee, OK
Bid Date: Jul 17 2025
Shawnee, OK
Bid Date: Jul 08 2025
Shawnee, OK
Bid Date: Jul 10 2025
Shawnee, OK
Bid Date: Jul 08 2025
Shawnee, OK
Bid Date: Jul 08 2025
Shawnee, OK
Bid Date: Aug 26 2025
Shawnee, OK
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
