Site work for a water / sewer project in Hebron, Indiana. Completed plans call for site work for a water / sewer project.

The Work shall include: Base Bid Lump Sum Work Doc notes: A complete hard copy set of bidding documents is available for $100. Rehabilitation work to existing 650,000-gallon wire-wound concrete ground storage tank includes exterior tank cleaning, miscellaneous crack and spall concrete repairs, leak injection repairs, interior tank cleaning, removal of sedimentation, installing new roof dome vent,exterior ladder modifications, adding a security enclosure to existing sample tap, exterior tank coating and logo, and other work as specified. Add Alternate Bid No. 01 – Tank Mixer - Lump Sum Work Adding one (1) new tank mixer to existing 650,000-gallon concrete ground storage tank and electrical work as required. Work shall be constructed under a Lump Sum Contract Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Contractor to whom the Work is awarded will be required to purchase and maintain insurance coverage as described in the Contract Documents on an "occurrence basis". The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner incorporated by reference.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

9

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
275
Bidding Soon
3,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

August 13, 2025

Project location map

To Be Determined, Hebron, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.